Sample Template Example of Beautiful Excellent Professional Curriculum Vitae / Resume / CV Format with Career Objective, Job Description, Skills & Work Experience for Freshers & Experienced in Word / Doc / Pdf Free Download
Summary of Qualifications
Highly energetic, self-motivated and results-driven professional in
Information Technology. Proven track performance in delivering IT applications
and Managing high performance teams.
14 years of IT experience to develop and deliver projects, including 5+years
of Project Management, in technical environments like Mainframe, TIBCO, DOTNET
Technical hands on in Mainframe
Experience in Banking and financial services, Insurance and Healthcare
domains.
Forecast, manage and monitored projects, besides the savings on
different projects
Skilled and experienced in process management methodologies like CMM,
CMMI, ISO 9000 and Lean. Implemented appropriate process improvement measures
in Projects.
Academics
UNIVERSITY
OF Bombay(Mumbai), Maharastra, India
Syntel Ltd
Apr
2006 – To Date
Project 1: Maximis upgrade 2011 Feb’ 2011 –
Sep’ 2011
Project
3: Investments FOTS/MOS/BOS/Derivatives Jan’ 2006
– Jan’ 2011
Project 6: FEP
and CID Maintenance & Support Jan’ 2005 – To Dec 2007
Project : Rate
and Product Development(RaPD) Dec’ 2002
– To Dec 2004
Project 1 : USMR
Support May’2001
– To Nov 2002
Project 2 : CCGS
Euro Conversion Oct’ 2000
– To Apr 2001
Download Resume Format
Summary of Qualifications
Highly energetic, self-motivated and results-driven professional in
Information Technology. Proven track performance in delivering IT applications
and Managing high performance teams.
14 years of IT experience to develop and deliver projects, including 5+years
of Project Management, in technical environments like Mainframe, TIBCO, DOTNET
Technical hands on in Mainframe
Experience in Banking and financial services, Insurance and Healthcare
domains.
Forecast, manage and monitored projects, besides the savings on
different projects
Handled more than 60 member
teams, led solution definition and solution adaptability with the business
teams, IT Development Team.
Experience in managing
projects with global delivery (Onsite - Offshore) Model
Recovered projects from red
status to green status, identifying the Critical Success Factors, using Risk
Management tools and experience, learning’s from past projects.
More than 8 years of
experience in system development, system integration and system testing.
Developed, reviewed and
approved, in various roles, business requirements, design specifications, test
strategy, test plans, test results, final acceptance documents for all projects.
Track record to deliver projects
(>1 Mn) on time, in budget with high quality experience of more than 8 years
using SDLC methodologies while meeting and exceeding the business expectations
and user needs.
Assisted in development and improvement in Physical access control.
Manage Statement of Works /
RFPs
Actively involved in PMO
Activities
Skilled and experienced in process management methodologies like CMM,
CMMI, ISO 9000 and Lean. Implemented appropriate process improvement measures
in Projects.
Academics
UNIVERSITY
OF Bombay(Mumbai), Maharastra, India
Bachelor of Commerce - 1991
Professional
Experience and Accomplishments
Syntel Ltd
Apr
2006 – To Date
Project Manager
1.
Reporting to the Delivery
Manager/Lead, Managed multiple Fixed Price and Time & Material projects
with multiple technologies across multiple location. Including one 100%
offshore. Responsible for, Statement of work/Change controls, Project Planning,
Pricing, Staffing, Estimations, Resource planning and management, Project
Tracking (SLA, Financial), Interacting with the PM/EM, identification of new
business area’s, Evaluating Project Risk and taking preventive actions,
Training and educating the team on functional and technical aspects, Following SDLC
processes meeting all milestones within the scheduled time and with an
excellent quality deliverables, Issue resolution, Status and Hours reporting, Following
QMS (ISO and SEICMM Level 5) model in all phases of the project and ensuring
the QMS Process being followed by the Team, Facing SQA, Internal and External
Quality Audits, Creation and maintenance of various Project Process Documents, Monthly
meetings with client in person or through video conference at offshore, Presentation
for client visits.RFP”s/RFQ, Due diligence
Environment: IBM Mainframe, ClientServer,
TIBCO and DOTNET
Tools: MS Project, Defect
Register, Gate Reviews & Quality Check Lists, Delivery Matrix, Resource
Management Tool, Equip, Status Reporting, Cost Estimation & Budget
tracking, Risk & Issue Management & MS Office
Team
Size 60+
Experience
Highlights
- Delivered
$10mn project to date in legacy environment & TIBCO(consisting of 9
inter-dependent applications) and 6 individual medium projects – 1 TIBCO projects,
3 DOTNET projects
- Provided
direction for, obtained, reviewed and approved project deliverables on
business requirements, design specifications, test strategy, test plans,
test results as required for different program / project gate reviews.
- Saved
costs of $780K on the programs by reorganizing the scope of work, creating
tools/utilities, cross training resources, increasing offshore ratio and
working in shifts from offshore.
- Managed
and procured services from major global vendor Allstate Insurance by
writing proposal documents / SOW documents and providing
details/presentations for negotiations/discussions.
- Extensively
coordinated and negotiated with cross functional teams - Security,
Quality, Admin and Infrastructure, PMO, HR, PDAC – besides the development
teams & business teams for the project. The teams spread across USA,
Ireland and India.
- Managed
multi-projects for 5+ years by applying the project management
methodology/process for clients in the Insurance and Healthcare domain.
- Managed
multiple overlapping Development, Maintenance, Support & QC testing
projects for Allstate Insurance to implement the new line of business,
addition of insurance companies, Maintain & Support the Statistical
& financial reporting and Investment front office, Middle office &
Back office projects.
- Skilled
at functional requirements gathering, design and test strategy
development, system and integration test plans, negotiations on production
acceptance criteria / deliverables / target dates / obtaining approvals,
Managing plans, creating project charter, Tracking milestones
- Key
player on CMM / CMMI certification and used Lean tools during preparation
and evaluation phases for certification levels.
- Managed
to increase the overall Gross Margin year over year by cross training
resources in different applications/Projects.
- My
responsibility also includes building the benefits cases, securing
funding, and defining initial requirements, project charters, timelines,
and staffing needs, beside deciding test strategy, obtaining, reviewing
and approving the technical project deliverables.
Experience
Highlights
Organization : Syntel Ltd.
Client : Humana
Project : Hummingbird
Sep 2011 – To
date
Scope : Manage Development,
Maintenance and Support project in Hummingbird applications. Projects related
to Diabetes, Prosper, Vitality and coach scheduler
Environment: DOTNET, Oracle
Tools MS Project /
Cost Estimation / Budget Tracking, CA Clarity
Team
size 12
·
Helping
the team in gathering the requirements, development of design and technical
specifications, development of test strategy and plan, creation and maintenance
of test environment, conduct of system and integration tests, conduct of
production readiness and deployments. The projects involve extensive
coordination and cooperation with the other projects teams of the upstream and
downstream systems. Added new process like Work Intake process, developed
process for managing the maintenance and support activities using CA Service
desk, implemented Capacity planning, Implemented Dashboard for weekly
monitoring of projects, Put in new SLA’s.
Results:
·
Successfully completed the Diabetes,
Prosper and Vitality projects upgrade along with savings by adding the process
of requirement reviews and design document which helped in identifying
additional requirements at early stage of the project and reducing the
maintenance cost.
Scope:
Client : Allstate
Insurance
Project 1: Maximis upgrade 2011 Feb’ 2011 –
Sep’ 2011
Scope : Enhancements to the
existing application to support the
upgrade to the Maximis product.
Environment: DOTNET, Oracle,
Informatica
Tools MS Project /
Cost Estimation / Budget Tracking, MS PRISM
Team
size 26
·
Managed
the team in gathering the requirements, the development of design and technical
specifications, development of test strategy and plan, creation and maintenance
of test environment, conduct of system and integration tests, conduct of
production readiness and deployments. The projects involve extensive
coordination and cooperation with the other projects teams of the upstream and
downstream systems.
Results:
·
Successfully completed the
upgrade along with savings by including the informatica upgrade in the integration
testing there by bringing about savings by reducing the Integration testing
cost and timelines and the overall time and cost.
Project 2: FSA Applications Maintenance Jan’ 2006 – Jan’
2011
Scope: Maintenance, Enhancement
and Support of various Statistical and Financial reporting applications of
premium claims and agent related information through the various interfaces
like State Calls, McCormack & Dodge General Ledger (M&D GL) system,
Front End Processor (FEP), SAP Mainframe Interface, Premium CYCLE,
Environment: IBM Mainframe -
COBOL, CICS, DB2, JCL, Assembler, PL1
Tools MS Project /
Cost Estimation / Budget Tracking, Reflection, EQuIP, MS PRISM
Team
size 18
·
Managed
the offshore Syntel team in gathering the requirements, the development of
design and technical specifications, development of test strategy and plan,
creation and maintenance of test environment, conduct of system and integration
tests, conduct of production readiness and deployments. The projects involve
extensive coordination and cooperation with the other projects teams of the
upstream and downstream systems.
Results:
·
Improved business
opportunities (Increased in revenue of 30% annual revenue due to the addition positions
in Business analysis area of M&D rewrite & Compliance)
·
Regulatory requirement
implemented within given deadline.
·
Developed tools and
utilities for quicker turnaround and cost savings
Project
3: Investments FOTS/MOS/BOS/Derivatives Jan’ 2006
– Jan’ 2011
Scope: Maintenance, Enhancement
and Support of Front office Trading system, Middle office system, Back office
system and Derivatives.
Environment: DOTNET, Oracle
Tools MS Project /
Cost Estimation / Budget Tracking, EQuIP
Team size 13
·
Managed
the offshore Syntel team in gathering the requirements, the development of
design and technical specifications, development of test strategy and plan,
creation and maintenance of test environment, conduct of system and integration
tests, conduct of production readiness and deployments. The projects involve
extensive coordination and cooperation with the other projects teams of the
upstream and downstream systems.
Results:
·
Improved business
opportunities (New applications were added as we progressed along and there was
an increase of about 40% in revenue over a year)
·
Regulatory requirement
implemented within given deadline.
·
Tracked and ensured that
the stringent SLA were adhered to met since there was a direct impact on the
income
Project 4: Data On Demand and ICS QC Testing Jan’ 2009 – Jan’ 2010
Scope: Managed Quality Assurance
Project for all of the ALIS / CCDB and MVR transactions and Integrated
customer service project.
Environment: TIBCO BW/BE,
Tools Defect Tracking
/ MS Project / Cost Estimation / Budget Tracking
Team
size 22
(Client team, Contractors and offshore team)
·
As
Test Manager of QA team, interacted
with the business and IT team, helped team in preparing the work flow of the
test activities & the testing strategy for the project. Ensured that the
strategy document comprehensively covers all aspects of transaction testing,
system testing, trading partner testing and UAT. Detailed hand-offs, test
environment creation, test data preparation and test execution are included. Handled
the defect management to report the test status to the management.
Results:
·
Testing was completed
within the timelines irrespective of delays in the development and was done
within the same budget by rotating people in shifts and weekends.
Project 5: Agent Number Remediation Jan’ 2008 – Jan’ 2009
Scope: Increase the size of the
Agent Number to allow more agents to be registered in the application without
expanding the size of the field.
(
Environment: IBM Mainframe
Tools: MS Project,
Visio, Budget tracking, Performance Reporting, Defect Management, CICS, DB2,
COBOL II, Scripting
Team
size :
7
·
Managed
the offshore Syntel team in gathering the requirements, the development of
design and technical specifications, development of test strategy and plan,
creation and maintenance of test environment, conduct of system and integration
tests, conduct of production readiness and deployments. The projects involve
extensive coordination and cooperation with the other projects teams of the
upstream and downstream systems.
Results:
·
Completed the project
within the timelines and budget by using tool developed in-house “ConActNo”
which converted the packed decimals.
·
Tracked and ensured that
the stringent SLA were adhered to met as the forms needed to be available
within the stipulated time as per the regulatory requirements
Project 6: FEP
and CID Maintenance & Support Jan’ 2005 – To Dec 2007
Scope: Maintenance of Front end
processor and Customer Information documents applications. Including break-fix
and enhancements
Environment: IBM Mainframe
Tools: MS Project,
Visio, Budget tracking, Performance Reporting, Defect Management, CICS, DB2,
COBOL II, Scripting
Team
size :
7
·
Managed
the team in gathering the requirements, the development of design and technical
specifications, development of test strategy and plan, creation and maintenance
of test environment, conduct of system and integration tests, conduct of
production readiness and deployments. The projects involve extensive
coordination and cooperation with the other projects teams of the upstream and
downstream systems.
Results:
·
Regulatory requirement
implemented within given deadline.
·
Tracked and ensured that
the stringent SLA were adhered to met as the forms needed to be available
within the stipulated time as per the regulatory requirements
Client:
Westfield Insurance Company
Project : Rate
and Product Development(RaPD) Dec’ 2002
– To Dec 2004
Environment: IBM Mainframe
Tools: GTAM, CICS, DB2,
COBOL II
Team
size :
7
Lead the team on the enhancements of the
Policy Maintenance Module, Claims Module and Reports Module. Main
responsibility was to liaise with the business leaders and IT Managers for
increasing the business. Apart from managing SDLC full cycle of activities of
the team, Reviewed & approved all the enhancements deliverables before they
are submitted to the client.
Client
: American Express (AMEX)
Project 1 : USMR
Support May’2001
– To Nov 2002
Environment: Mainframe
Tools: CICS, COBOL II, JCL, DB2, Endevor,
Jobtrac
Position: Mainframe Technical Lead
Team size : 5
Led the mainframe
team in Maintenance and Production Support of US Membership rewards and co-branded
cards. Studied, assigned, monitored, and resolved trouble tickets. Reported summary status during implementation.
Conducted root-cause analysis for problems. Co-ordinated between dependent
system personnel for proper feeds, changes, and resolution. Provided production
support and enhancement study. Performed database change control activities and
maintenance.
Project 2 : CCGS
Euro Conversion Oct’ 2000
– To Apr 2001
Environment: Mainframe
Tools: CICS, Chttps://docs.google.com/uc?id=1I1DqGdoFmJsT6ex1HIWWBoNeNJyIO493&export=downloadOBOL II, JCL, DB2, Endevor,
Jobtrac
Position: Mainframe Technical Lead
Team size : 4
Led the mainframe team in the
Corporate card global statementing Euro conversion project Gathered the requirement and worked with the offshore team to come
up with the design. Provided direction to the offshore team, reviewed the
deliverables before delivering to the client. Help resolve issues and
completely handled the integrating and UAT testing.
Organization
: Cotec Computing Services
Client : NatWest
Bank
Project : BAF
Re-engineering Oct’ 1997 – To Jun
2000
Environment: Mainframe
Tools: CICS, COBOL II, JCL, DB2, Endevor,
Assembler
Position: Mainframe Programmer Analyst
Developed design,
coded and unit tested programs for Re-engineering of Branch accounting functions.
Download Resume Format
0 comments:
Post a Comment