Sample Template Example of Beautiful Excellent Professional Curriculum Vitae / Resume / CV Format with Career Objective, Job Description, Skills & Work Experience for Freshers & Experienced in Word / Doc / Pdf Free Download
Omega Network Services 9/99 – Present
Client
- Standard
& Poors (
Client
- Richard Eisner & Company (
Client
- Department of
Transportation –State of
Client
-
Technology Solutions Company 3/1997–6/1999
Automated Concepts Incorporated: Consultant
NASSAU Community College . - Data Processing and
Computer Science
Download Resume Format
Derrick Katona
2011 North Lakeshorne Drive
610
Hamilton, DA 22014
610-239-4022
Derrick.katona71@yahoo.com
Summary
Over
18 years of experience in hardware/software design with a formal training in
Computer Science and Data Processing. Experience includes project planning and
management, strategy planning, security
design, Disaster Recovery, network programming, networks
design, systems and applications programming, Storage Area Network Design and Server Consolidation Processes and methodologies. A person with
team leadership and problem solving skills, who enjoys challenges and gets
results. Extensive experience with web based solutions. Knowledge of Specific Cisco Routers and switches (6509, 2900
series, 3900 series, and the 7500 router). Over 5 years of in the field Windows
2000/2003 Active Directory architecture experience. Global Exchange 2003/2007/7 Mail/Active Directory Integration and
Migration architect is present practice area. Extensive experience with
network security issues, as well as internet/intranet
security. Extensive knowledge of Windows 2000/2003/2008 Certificate Server (PKI ),
IIS 5.0/60, Proxy Server 2.0/ISA Server 2000, MS Exchange
Server 4.0/5.0/5.5/2000,2003/2008, including all connectivity and migration issues involving multiple
releases of Notes, CC Mail, MS Mail,
TAO, SMTP Exchange /2003/2007/2010. Extensive knowledge of various Storage Area Network Technologies. . Extensive knowledge of Sharepoint 2003/2007 Extensive
knowledge of Microsoft SMS 1.0/2.0/ 2003.
Extensive Data Center
consolidation and systems redesign Extensive
knowledge of Firewall technologies including Proxy Server 2.0, ISA server
2000/2004,
Installed REMEDY helpdesk solution for Client tickets. Checkpoint, and Cisco
Pix. Extensive knowledge of SMARTS inCharge
6.0 Network Monitoring software. Extensive knowledge of NetIQ software, including AppManager
3.4/4.02/5.1, Security Manager, Operations Manager, Exchange Migration tool,
DMA Migration tool.
Languages: Visual Basic 3.0/4.0/5.0/6.0, Access 97, Excel 97, Pascal,
Vbscript, JavaScript, Perl, CGI, XML, XSL, HTML, DHTML, CSS1/2, ASP pages, .NET
framework
Operating
Systems: Windows 95, Windows NT Workstation
3.51/4.0/2000/XP Windows NT Server 3.51/4.0/2000, Linux, OS2/Warp3.0/4.0,
Novell 3.1x/4.1./5.1
Databases: Access 7.0/97/2000, Lotus Approach, Dbase III/IV, Paradox 5.0, SQL
Server 6.5/7.0/2000, Sybase SQL Server 11,Oracle 7.3/8.1
Hardware: IBM/Compatible, Digital, Gateway, Dell, Fiber Channel, ISDN, Frame
Relay, Storage Area Networks from
Dell, Compaq, and Xiotech. Microsoft
Clusters and 2008
Tele-communications: TCP/IP, IPX/SPX, Netbieu
Other: MS Office 4.3/7.0/97, Word 7.0/97, Excel 7.0/97 WordPerfect 6.0/1
Approach, Winfax Pro 7.0/8.0, Act 2.0/3.0/4.0, Tempus, PC Anywhere32, Timbuktu,
Outlook, MS DNS, WINS, UNIX DNS, ADO/RD0, Data Shaping, NetIQ AppManager, NetIQ
Security Manager, NetIQ Operations Manager, Netscape 2.0/3.0/4.03. IE 4.01/5.5
Administrations
Experience:
Omega Network Services 9/99 – Present
Client Gramercy
Park hotel 10/10/10 to 10/24/10
Designed and deployed new Windows 2008 R2 domain, in preparation for
Installation and deployment of MS Exchange 2010. Created Trust relationships between old
domain and new one, then proceeded to use ADMT for Migration purposes of USERS,
COMPUTERS, and GROUPS. Once completed and verified, I created a Migration
Script tool, to move users Mailboxes from Windows 2003/Exchange 2003 to Windows
2008 /Exchange 2010 Domain.
Client- Hermes of Paris 5/10-
Present
Network
Architect, responsible for re-designing and
re-deploying Windows 2003 environment in preparation for Windows 2008 Upgrade.
Redesigned and Deployed Active Directory, DNS, DHCP, Sites, WSUS, desktop
security, and Group Policy. Redesigned and Upgraded Microsoft Windows 2003
Server/SQL Server 2005 Fail-over Cluster to Windows 2008 enterprise Server/Microsoft SQL 2008 Enterprise Fail-over
Cluster. Designed and deployed new Citrix
Zen APPS Fail-over terminal cluster on VMWARE 3.4 for new POS solution (32 Stores in 28 Cities, 6 Countries). Upgrading
VMWARE to 4.0. Introduced Second factor
authentication solutions Phone Factor and Authenware. Designed Patch
management strategy for Desktops and Laptops globally, as well as Servers.
Reviewed and presented Backup and disaster recovery options as well and Business continuity approaches and
solutions. Participated extensively in PCI
compliance methodology and documentation. Presented software Compliance
tools and methods. Upgraded Blackberry Server
from version 4 to 5. Presenting Migration Plan from Lotus Notes 8.5 to Exchange
2010. Reconfiguring Compellent SAN to support DR replication and
backup
Client- Ness.com 12/09- 4/10
Project Manager for the Microsoft Communications
Server 2007 R2 for 3,000+ users, in 4 global locations. Designed, installed
and configured OCS 2007 R2 in a 5 server Enterprise
configuration, with interaction with Nortel VOIP solution.
Project
Manager for Design, Installation, Configuration for
Network Management System “Easy Vista ” Software to over 2,800 endpoints. Also
programming integration with Remedy Helpdesk Solution.
Project
Manager for Design, installation and configuration,
migration for MS exchange 2003 to Exchange 2010 for 3000+ users. Included integration of, Blackberry
Enterprise server, Symantec Archiving solution, IPhone, MAC-Entourage, PDAs,
Phones, Symantec Backup Exec, Forefront anti-spam/Anti-virus. Migration of all
Email and applications, as well as un-archiving of Email for migration into
Exchange 2010 Email Archiving solution…
Client – Superior Glacier LLC 7/07 –
6/09
Systems
Analysis for Windows 2000/2003 Active Directory/
Exchange 2003 ISCSI Replication
between London
and NY.
Designer
and re-architect for Notes Migration to Exchange 2003/7
infrastructures. Designer and architect for Windows 2003 infrastructures. The
technologies to be used include Windows
Server 2003, Windows XP Workstations, Exchange 2003. The project entailed the implementation
of an Upgrade to the Left Hand SATA Storage
to the Left Hand SAS series and the
design of a Disaster Recovery Site in Washington
DC , using Left Hand replication and
Application High Availability Solutions. Designer and architect for
Exchange 2003 infrastructures. Creating design documentation for Exchange 2003
and Administrative Procedures. Designed and deployed Cisco VPN solution between
8 Global locations. Deployed Windows 2003/Exchange 2003. Introduced and built Microsoft
Cluster Server as a solution for high availability, scalability, and
redundancy. Left Hand ISCSI is being implemented as a solution to server consolidation on the basis of
responsiveness and dependability. Designer and architect for Exchange 2003
infrastructures. Created design documentation for Exchange 2003 and
Administrative Procedures
Client – Fairfield Greenwich Group 1/06 – 10/08
Systems
Analysis for Windows 2000/2003 Active Directory/
Exchange 2003 SAN Replication
between London
and NY.
Designer
and re-architect for Exchange 2003/2007
infrastructures. Designer and architect for Windows 2003 infrastructures. The
technologies used were Windows Server 2003, Windows XP Workstations 2000 professional,
Exchange 2003. The project entailed the implementation of an Upgrade to the Xiotech SAN to the New
3000E series and the design of a Disaster Recovery Site in London , using Topio Data and Application High Availability Solutions. Designer
and architect for Exchange 2003/2007 infrastructures. Created design
documentation for Exchange 2003 and Administrative Procedures. Designed and
deployed Cisco VPN solution between 8 Global locations. Deployed Windows
2003/Exchange 2003. Introduced and built Microsoft Cluster Server as a
solution for high availability, scalability, and redundancy. Xiotech
Magnitude SAN was implemented as a solution to server consolidation on the basis of responsiveness and
dependability. Designer and architect for Exchange 2003 infrastructures.
Created design documentation for Exchange 2003 and Administrative Procedures
Client - Sean John 11/05 – 1/07
Project Manager for the Windows 2003 SAN SQL Cluster project.
The technologies used were Windows Server
2000/2003, Windows XP Workstations 4.0/2000/XP professional, , MS Office XP/2003,
Remote Access, and Veritas Backup. Scan Mail/Sybari antivirus, Norton
Enterprise antivirus. The project entailed the migration of initial 200 + Staff
users and then another 100 remote users to
Windows 2003 It involves designing, architecture and implementation of Windows
2003 in preparation for Exchange 2003.
Introduced and Microsoft Cluster Server
as a solution for high availability, scalability, and redundancy. Xiotech 3D SAN was used on the basis of responsiveness and dependability. Extensive Data Center
consolidation and systems redesign Implemented replication topologies. Designed
PKI MS Certificate Server for the QC, aided in the Design of the DMZ, Cisco PIX
and Proxy Server solution, reviewed and redesigned DNS architecture (implementing
Windows 2003 integrated DNS), Working with Network Group on Cisco configuration
of 7500 router and 6513 switches. Worked with the Network Group on configuring
the 3900, and 2900 series switches in the various departments. Installation of
Windows 2003 Terminal Server, evaluated Linux as Potential Print server. Created
OS Distribution mechanism of Windows 2000/xp using RIS, creating distribution
media and installation packages for Office/Outlook 2003. Reviewing and
redesigning WINS architecture (later implementing windows 2000 WINS).
Client – HRI Corp. 9/06 – 12/06
Project
Manager for Notes R5/R6 Migration to Exchange 2003.
Presented several options to upper managements along with Costs, timelines,
ROI, TCO
evaluations. Presented several designs and architectures for Exchange 2003 infrastructures and replication solutions. The
technologies used were Windows NT Server 4.0/2000/2003, Windows NT Workstations
4.0/XP professional. The Project entailed the Q&A of the methodology used
to successfully move 400 users from all over the North East to the NY office
Client – Phillips De Pury & Luxemburg 12/04 –5/09
Project
Manager for Windows 2003/XP rollout to 100 desktops
in 5 Global locations
Designer
and architect for Exchange 2003 infrastructures.
Designer and architect for Windows 2003 infrastructures. The technologies used
were Windows NT Server 2003, Exchange 2000/2003. Introduced and built Microsoft
Cluster Server as a solution for high availability, scalability, and
redundancy. Xiotech Magnitude 3D SAN was implemented as a solution to server consolidation on the basis of
responsiveness and dependability. Designer and architect for Exchange 2003
infrastructures. Created design documentation for Exchange 2003 and
Administrative Procedures. Consolidated servers from outsourced Data Center
in Kansas to
the NY office
Client – William B. May Realty. 9/04
– 10/04
Project
Manager for Windows 2003/XP rollout to 80 desktops in 4 locations
Designer
and architect for Exchange 2003 infrastructures.
Designer and architect for Windows 2003 infrastructures. Project consisted of
upgrading from Windows NT 4.0 solution to technologies using Windows 2003,
Windows XP, and Exchange 2003. The project entailed the implementation of an
initial 80+ users to Windows 2003
Active Directory and Exchange 2003. Created design documentation for Exchange
2003 and Administrative Procedures
Client – Cliquot Inc. ( Veuve Cliquot)
12/03 – 1/04
Project
Manager for Windows 2003/XP rollout to 40 desktops in 2 locations
Designer
and architect for Exchange 2003 infrastructures.
Designer and architect for Windows 2003 infrastructures. Project consisted of
moving Notes R5 Migration to Notes R5.
Presented several designs and architectures/infrastructures and replication
solutions solution to technologies using Windows 2003, Windows XP, and Exchange
2003. The project entailed the implementation of an initial 40+ users to Windows 2003 Active
Directory and Exchange 2003. Created design documentation for Exchange 2003 and
Administrative Procedures
Client – Helen Keller Financial group. 12/03 – Present
Project
Manager for Windows 2003/XP rollout to 70 desktops in 2 locations
Designer
and architect for Exchange 2003 infrastructures.
Designer and architect for Windows 2003 infrastructures. Project consisted of
upgrading from Apple Macintosh solution to technologies using Windows 2003,
Windows XP, Exchange 2003. The project entailed the implementation of an
initial 70+ users to Windows 2003
Active Directory and Exchange 2003. Created design documentation for Exchange
2003 and Administrative Procedures
Client – FSVS Executive Search Corp. 11/03 – 1/04
Project
Manager for Windows 2003/XP rollout to 20 desktops in 2 locations
Designer
and architect for Exchange 2003 infrastructures.
Designer and architect for Windows 2003 infrastructures. Project consisted of
upgrading from Apple Macintosh solution to technologies using Windows 2003,
Windows XP, and Exchange 2003. The project entailed the implementation of an
initial 20+ users to Windows 2003
Active Directory and Exchange 2003. Created design documentation for Exchange
2003 and Administrative Procedures
Client – General Motors Asset Management Corp. 8/12/03 – 10/03
Advisor
for Notes R5
Migration to Notes R5. Presented several options to upper managements along
with Costs, timelines, ROI, TCO evaluations. Presented
several designs and architectures for SQL 2000 infrastructures and replication
solutions. The technologies used were Windows NT Server 4.0/2000, Windows NT
Workstations 4.0/professional. The Project entailed the Q&A of the
methodology used to successfully move users from all over the US to the NY office. Introduction
of the SMARTS network monitoring solution to better and more quickly identify
system failures, as well as applications. Presently evaluating Windows
2003/Exchange 2003
Client – Fairfield Greenwich Group 4/03 – 10/08
Systems
Analysis for Windows 2000/2003 Active Directory/
Exchange 2000/2003 rollout in 6 global
locations
Designer
and re-architect for Exchange 2000/2003
infrastructures. Designer and architect for Windows 2000 infrastructures. The
technologies used were Windows NT Server 4.0/2000, Windows NT Workstations
4.0/profesional, Exchange 2000/2003. The project entailed the implementation of
an initial 150+ users to Windows
2000 Active Directory and Exchange 2000., and more recently the migration to
Windows 2003/Exchange 2003. Designer and architect for Exchange 2000
infrastructures. Created design documentation for Exchange 2000 and
Administrative Procedures. Designed and deployed Cisco VPN solution between 8
Global locations. Deployed Windows 2003/Exchange 2003. Introduced and built Microsoft
Cluster Server as a solution for high availability, scalability, and
redundancy. Xiotech Magnitude SAN was implemented as a solution to server consolidation on the basis of
responsiveness and dependability. Designer and architect for Exchange 2003
infrastructures. Created design documentation for Exchange 2003 and Administrative
Procedures.
Client – Tinicum enterprises 12/2 –6/09
Project
Manager for Windows 2000/XP rollout to 80 desktops in 4 locations
Designer
and architect for Exchange 2000 infrastructures.
Designer and architect for Windows 2000 infrastructures. The technologies used
were Windows NT Server 4.0/2000, Windows NT Workstations 4.0/profesional,
Exchange 5.5/2000/2003. The project entailed the implementation of an initial 40+ users to Windows 2000 Active
Directory and Exchange 2000/2003. Designer and architect for Exchange 2000/2003
infrastructures. Created design documentation for Exchange 2000/2003 and
Administrative Procedures.
Client – Coudert Brothers LLP 12/02 – 4/03
Systems
Analysis and re-architecture for Windows 2000
Active Directory/ Exchange 5.5/2000 rollout in 19 global locations, including
DNS, WINS, and DMZ
Designer
and architect for Exchange 2000 infrastructures.
Designer and architect for Windows 2000 infrastructures for over 4,000 users. The technologies used were
Windows NT Server 4.0/2000, Windows NT Workstations 4.0/2000/XP professional,
Exchange 5.5/2000. The project involved designing, re-architecture and the
corrected implementation of Windows 2000 in preparation for the corrected
deployment of Exchange 2000. Designer and architect for Exchange 2000
infrastructures. Created design documentation for Exchange 2000 and
Administrative Procedures, Firewall Documentation, and recommendations for
introducing SAN
technology
Designed and deployed several Windows 2000 clusters using Compaq MSA500 for Disaster Recovery,
including Exchange and SQL as well as File Servers
Client – MetroPlus Healthcare Systems 11/7-8/02
Systems
Analysis for
Windows 2000 server & SQL server
2000. Recommended redesign of existing database, and hardware design. Recommended
Microsoft Cluster Server as a solution for high availability,
scalability, and redundancy. Recommended Xiotech
SAN as low cost, high availability solution. Resolved reporting issues, and
Database performance issues.
Client – SMARTS 11/15 – 1/03
Project
Manager for Windows 2000/XP rollout to 200 desktops
in 1 location
Designer
and architect for Exchange 2000 infrastructures.
Designer and architect for Windows 2000 infrastructures. The technologies used
were Windows NT Server 4.0/2000, Windows NT Workstations 4.0/profesional,
Exchange 2000. The project entailed the implementation of an initial 170+ users to Windows 2000 Active
Directory and Exchange 2000. Introduced and built Microsoft Cluster Server
as a solution for high availability, scalability, and redundancy. Designer and
architect for Exchange 2000 infrastructures. Created design documentation for
Exchange 2000 and Administrative Procedures
Client – New York City Dept of Education – District 27 11/02
– 1/03
Project
Manager for Windows 2000/XP rollout to 170 desktops in 2 locations
Designer
and architect for Exchange 2000 infrastructures. Designer
and architect for Windows 2000 infrastructures. The technologies used were
Windows NT Server 4.0/2000, Windows NT Workstations 4.0/profesional, Exchange 2000.
The project entailed the implementation of an initial 170+ users to Windows 2000 Active Directory from Apple Macintosh. It involved designing,
architecture and implementation of Windows 2000 in preparation for connecting
to the Dept of Education’s existing Forest .
Client – General Motors Asset Management Corp. 11/04/02 – 11/09/02
Advisor
for Notes R5 Migration to Microsoft Active
Directory/Exchange. Presented several options to upper managements along with
Costs, timelines, ROI, TCO evaluations.
Presented several designs and architectures
for Windows 2000 infrastructures. The technologies used were Windows NT Server
4.0/2000, Windows NT Workstations 4.0/profesional, Exchange 2000. The project
entailed the migration of an initial 150+
users to Exchange 2000 from Lotus Notes R5. Options for upgrading to Notes R6 were also
presented
Client – New York Daily News 9/02 – 10/2
Project
Manager for Windows 2000/XP rollout to 1,000 desktops in 19 locations
Designer
and architect for Exchange 2000 infrastructures.
Designer and architect for Windows 2000 infrastructures. The technologies used
were Windows NT Server 4.0/2000, Windows NT Workstations 4.0/profesional,
Exchange 5.5/2000. The project entailed the migration of an initial 800+ users to Exchange 2000 from Exchange
5.5 & CCMail. It involved designing, architecture and implementation of
Windows 2000 in preparation for Exchange 2000. Introduced and built multiple Microsoft
Cluster Server as a solution for high availability, scalability, and
redundancy. Designer and architect for Exchange 2000 infrastructures. Created
design documentation for Exchange 2000 and Administrative Procedures
Client – Phillips De Pury & Luxemburg 8/02 – Present
Project
Manager for Windows 2000/XP rollout to 200 desktops
in 5 Global locations
Designer
and architect for Exchange 2000 infrastructures.
Designer and architect for Windows 2000 infrastructures. The technologies used
were Windows NT Server 4.0/2000, Windows NT Workstations 4.0/profesional,
Exchange 5.5/2000. The project entailed the migration of an initial 200+ users to Exchange 2000 from Lotus
Notes R5. It involved designing, architecture and implementation of Windows
2000 in preparation for Exchange 2000. Created design documentation for
Exchange 2000 and Administrative Procedures
Client – District 32 New York City Board of Education 5/02 – 9/02
Project
Manager for Windows 2000/XP rollout to 250
desktops. The technologies used were Windows 2000 Server, Windows 2000 Professional/XP,
Remote Installation Services, WinInstall 7.5, and Symantec Norton Corporate
Antivirus. Integration with the NYCBOE existing Exchange 2000 system was
established. The project entailed the migration of 200+ users to Windows 2000
from Windows NT 4.0. It involved
designing, architecture and implementation of Windows 2000, creating Group
Policy objects for both management and Administration. Application (MSI)
packaging of various software products was completed. Those packages include
Office 2000/XP and Adobe Acrobat reader, IBM Mainframe client.
Client
- Standard
& Poors (New York , NY ) 2/02 – 5/02
Advisor for
the Windows 2000 /Exchange 2000 from NT 4.0 and Lotus Notes Global Migration to
Active Directory. The technologies used were Windows NT Server 4.0/2000,
Windows NT Workstations 4.0/profesional, Microsoft Operations Manager (MOM), NetIQ AppManager 4.3, Exchange 5.5/2000. The project entailed the
migration of 4,500+ users to Exchange 2000 from Exchange 5.5 and Lotus Notes 4.6c mail system. It involved
designing, architecture and implementation of Windows 2000 in preparation for
Exchange 2000. Introduced Microsoft Cluster Server as a solution for
high availability, scalability, and redundancy. Xiotech Magnitude SAN
was presented as a solution to server
consolidation on the basis of responsiveness and dependability.
Client
- Richard Eisner & Company (New York ,
NY ) 2/02 – 5/02
Architect and Designer for the Exchange 2000. The technologies used were Windows NT Server
4.0/2000, Windows NT Workstations 4.0/profesional, NetIQ AppManager 4.3, Exchange 5.5/2000. The project entailed the
migration of an initial 500+ users
to Exchange 2000 from Exchange 5.5 mail system. It involved
designing, architecture and implementation of Windows 2000 in preparation for
Exchange 2000. Introduced and built Microsoft Cluster Server as a
solution for high availability, scalability, and redundancy. Xiotech Magnitude
SAN was presented as a solution to server
consolidation on the basis of responsiveness and dependability. Designer
and architect for Exchange 2000 infrastructures. Created design documentation
for Exchange 2000 and Administrative Procedures.
Client
- Department of
Transportation –State of Kansas
9/01 – 1/02
Architect and Designer for the Windows 2000 /Exchange 2000 from GroupWise 5.5 project.
The technologies used were Windows NT
Server 4.0/2000, Windows NT Workstations 4.0/profesional, Microsoft Operations
Manager (MOM), Exchange 2000. TrendMicro Scan Mail antivirus, Norton
Enterprise antivirus was used as a corporate standard. The project entailed the
migration of an initial 3,000+ users
to Exchange 2000 from GroupWise 5.5 mail
system. It involved designing, architecture and implementation of Windows
2000 in preparation for Exchange 2000. Introduced and built Microsoft
Cluster Server as a solution for high availability, scalability, and
redundancy. Xiotech Magnitude SAN was used on the
basis of responsiveness and dependability Designer and architect for Exchange
2000 infrastructures. Designer and architect for Windows 2000 infrastructures. Server consolidation. Review and
troubleshooting of DNS infrastructure, and installation of Exchange 2000. Design
Backup solution using Veritas (Seagate)
Backup Exec for SAN
using tape Library. Testing and installation of OWA 2000, Installation of ISA
Server. Design, configuration and installation of Microsoft Operations Manager.
Configuration of monitoring solutions. Created documentation for Exchange
systems Design guide. Created Migration Project plan. Created Administrative
Management plan. Created Disaster Recovery plan
Client - L’Oreal Corp (Clark , NJ ) 6/2001- 7/2001
Review of existing MS Exchange 5.5
environment
Review of NETIQ AppManager deployment
Testing of AppManager 4.0 in production
environment
Design and Implementation AppManager 3.4
into production
Client - Agere Systems (Microelectronics division of Lucent) 4/2001-6/2001
Network Security Analyst
Review of existing network security
policies and procedures, review of existing network security infrastructure, review
of existing Windows 2000 Active Directory design and architecture.
Evaluation and review of DMZ design, evaluation of ISS software for intrusion detection
Evaluation of Microsoft ISA Server, and
Checkpoint as a Firewall. Design and architecture of PKI infrastructure within a Windows 2000 environment. Design and
analysis of PGP Key server within a
Windows 2000 environment. Cost analysis of Windows 2000 Security requirements. Installation
and troubleshooting of Private Ark
software (Document security package). Built Test Lab for evaluating
encryption products and determining capability of these products on the desktop
and laptop. Created a Windows 2000 Test
Lab for evaluating Certificate Server and nCipher (PKI) card compatibility and capability. Created and
demonstrated extensive use of Windows 2000 Group policies. Created automated
distribution of Digital Certificates using GPOs.
Taught training classes for internal Agere Systems security personnel Evaluation
of Linux as an alternative solution to Sun Solaris
Client
- New
York City Board of Education; 6/1999 – 1/2001
Project Manager for the Windows 2000 / Exchange 5.5/2000 project.
The technologies used were Windows NT
Server 4.0/2000, Windows NT Workstations 4.0/profesional, Windows 98,
MS Office 97/2000, Remote Access, and Seagate 7.0/80. Scan Mail antivirus,
Norton Enterprise antivirus. The project entailed the migration of an initial 4,000+ users and then another 16,000 to Exchange 5.5 (and later to
Exchange 2000) from TAO Mainframe mail
system, and the First Class message system. It involved designing,
architecture and implementation of Windows 2000 in preparation for Exchange
2000. Introduced and built Microsoft
Cluster Server as a solution for high availability, scalability, and
redundancy. Dell Computers SAN 3.0 was used on the basis of
responsiveness and dependability. Extensive
Data Center
consolidation and systems redesign Designer
and architect for Exchange 5.5 infrastructures. Designer and architect for Exchange 2000 infrastructures. Designer and architect for Windows 2000
infrastructures. Installation of Exchange 2000 into and Exchange 5.5
environment. Migration of TAO mail to Exchange
Installation and configuration of MAGIC /REMEDY helpdesk ticketing system
for 11,000 users, with integration of NetIQ monitoring system to same
Testing and installation of OWA 2000. Installation
of Proxy Server 2.0, designed and taught Training classes for supporting
Windows 2000. Installation of ISOCOR X400 Mail Connector.
Installation and Design of SQL Server 7.0
throughout the BOE. Implemented replication topologies. Programming Outlook Forms for specific school functions. Designed
the architecture for distribution of MS Exchange and Outlook to 1.2 Million
students in the school system. Designed possible custom web pages for specific
administrative functions. Review and submitted design for implementing security
within the mail system. Designed and Implemented PKI MS Certificate Server for
the BOE, aided in the Design of the DMZ, Cisco PIX and Proxy Server 2.0, reviewed
and redesigned DNS architecture (implemented Windows 2000 integrated DNS), Designed
DDNS and DHCP scopes for Windows 2000. Redesigned the SQL Contracts
database.. And consolidated 4 databases consisting
of MS ACCESS Worked with Network Group on Cisco configuration of 7500 router
and 6509 switch. Worked with the Network Group on configuring the 3900, and
2900 series switches in the districts. Installation of Windows 2000 Terminal
Server, evaluated Linux as Potential Print server. Created Distribution
mechanism of Windows 2000 using RIS, created distribution media and
installation packages for Office/Outlook 2000. Reviewed and redesigned WINS
architecture (later implementing windows 2000 WINS)
Technology Solutions Company 3/1997–6/1999
Client - Pfizer
Pharmaceuticals Corp., 2/1999- 6/1999
Project manager for designing, developing, evaluating, rewriting,
Q&A, testing, distributing of the company’s global prototype Project and Expense Tracking System web
based prototype. Designed MS SQL 6.5 Server Database for Prototype. Wrote
stored procedures for use in Prototype. Use of Data shaping presented as a
reporting mechanism on the web. The technologies involved were Windows 95, ASP
pages, ADO 2.0,
Interdev 6.0, D
L, HTML, Go Live 4.0, MS SQL Server 6.5/7.0, JavaScript, and
VBscript. Co-development of an XML
version of the same prototype. Additionally, Q&A, testing on an existing
web application. Additionally, upgrading of three OS/2 3.0 servers to OS/2 4.0
and the Y2K patches for same.
Client - Constitution Reinsurance 1/1999-2/1999
Security Analyst
Performed a security audit of existing Environment .Covered Windows NT 4.0
security settings on servers. System policy settings. Internal Auditing
policies and tools. Intrusion detection
and analysis. Probed external access vulnerabilities. Identified internal
security short comings. Demonstrated vulnerabilities from internal users
Client -
Union Europeene de CIC, 9/1998-11/1998
Project manager for evaluating, recommending, and designing an Exchange 5.5 environment for 100 users, with
connectivity to three separate mail systems (MS Mail, SMTP, Notes 4.51) in Europe . Responsible for evaluating the network
infrastructure as well as the security issues involved. The technologies
involved were Windows NT workstation 4.0. Additionally, presented Microsoft
Outlook 98 as the e-mail client of choice along with IE 4.01.
Client - Warner
Lambert Corp, 2/1998-9/1998
Project manager for evaluating, rewriting, Q&A, testing,
distributing of the company’s global Financial Consolidation System. The
technologies involved were Windows 95, Excel 97, Digital VAX, HP UNIX, and
PEOPLESOFT GLS. Upgraded Excel 4.0 code to Excel 97 Wrote test scripts for
evaluating the Financial Consolidation System performance. Created distribution
media using Install Shield 5.0 (Web based and CD Rom) Extensive use of PERL
Script for interaction of UNIX to Windows NT. A review and recommendation of
specific WAN security options was also done. Additionally, Microsoft Message
Queue Server was presented as a solution for the replacement of the VAX.
Designed the infrastructure of the application, including security, site
management, routing of messages between global applications. This was designed
as a better means of submitting financial data from global affiliates. Additionally,
involvement with, upgrading the existing application to a web based solution
using Peopletools 7.0 and JAVA
Client - Bear
Stearns & Company, 3/1997-2/1998
Assistant Project Manager for an Exchange 5.0. project.
The technologies used were Windows NT
Server 3.51/4.0, Windows NT Workstations 3.51/4.0, Windows 95, MS Office
7.0/97, BackOffice 2.5, Remote Access, Pcanywhere32, Timbuktu , Exchange 4.0/5.0 Server, Modem
Pooling software and hardware, and ArcServe 6.0. The project entailed the migration
of 8,000+ users to Exchange 5.0 from
CCMail. Built an intranet web server
and associated communications using IIS 3.0 with Active Server Pages to use
Access 97 as a backend database. Setup Exchange 4.0/5.0. for Internet Mail, CC
Mail, Notes, UNIX, MS Mail, and Connectivity. Setup and modified user accounts
and mailboxes using directory Import/Export. Setup Microsoft SQL Server 6.5 and
clients and service packs. Setup Cheyenne
ArcServe 6.0 and Inoculan. Setup Macfee/Norton AntiVirus for workstations and
servers. Beta tested antivirus software for Exchange Mail. Setup 18 Exchange
5.0 / Windows NT 3.51 Servers with service packs. Setup 2 Exchange 5.0 / IIS
3.0 Windows NT 4.0 Server with service pack. Provided beta testing of Microsoft
Proxy Server. Wrote extensive migration tools using VBA for Access 97 and Excel
97, as well as Visual Basic 4.0 (including part of the Personal Address Book). Extensive
use of Active Server Pages/VBscript for Windows NT. Wrote and designed Outlook
E-Forms using VBscript for use in migration issues and other LAN administrative
functions. Wrote and edited VB code for use in SMS 1.2 to distribute Outlook
and Exchange clients. Provided training of desktop support staff.: Installed
and configured Notes Connector for Exchange from Linkage Software. Wrote
documentation for disaster recovery of Exchange Servers. Responsible for
testing IIS 3.0/4.0 with Active Server Pages and Exchange 5.0 for use outside
the firewall for the firms clearance project. Created scripts for auditing
events beyond the use of Windows NT event viewer
Client - Human Resources
Management (HRM) 9/1996–3/1997
The technologies used were Windows NT
Server 3.51/4.0, Windows NT Workstations 3.51/4.0, Windows 95, MS Office
7.0, BackOffice 2.0, Remote Access, Pcanywhere32, ISDN, Exchange 4.0 Server,
Modem Pooling software and Hardware, and ArcServe 6.0. Designed and implemented
a network infrastructure. Built a web server and associated communications
using IIS 2.0. Setup Exchange 4.0. for internet mail with service packs. Set user accounts and mailboxes. Setup Sybase
SQL Server 11 and clients. Setup Microsoft SQL Server 6.5 and clients and
service packs. Setup Microsoft System Management Server 1.1. Setup Cheyenne
ArcServe 6.0 and Inoculan. Setup Macfee Anti Virus for workstations and
servers. Setup 2 Windows NT 3.51 Servers
with service packs. Setup 1 Windows NT
4.0 Server with service pack. Setup 30 Windows NT 4.0 workstations with service
pack. Installed REMEDY helpdesk
solution for Client tickets.
Client - Miki Sangyo, (USA
Inc) 6/1996 –Present
The technologies used were Windows NT
Server 3.51/4.0, Windows NT Workstations 3.51/4.0, Windows 95, MS Office
7.0, BackOffice 2.0, Frame Relay, Remote Access Pcanywhere32, ISDN, Exchange
4.0 Server, and video conferencing. Designed and implemented network
infrastructure. Setup a web server and established company’s address on the
Internet (www.mikisangyo.com). Setup communication between New
York , Germany
and Tokyo .
Designed web page using Front Page 2.0/3.0.
Built Web Server and associated communications using IIS 2.0/3.0/4.0. Set Frame
Relay connection using Exchange 4.0/5.5. for internet mail.
Set user accounts and mail synchronization
between Tokyo and New York.Setup replication
between Tokyo and New York for Exchange 4.0. Installed all
Service packs to both server and clients. Suggested network design for Tokyo office concerning
Exchange 4.0. Setup and distributed EDI software for use with both clients and
suppliers ( AVVISO ). Q&A a new
accounting software package ( UA Corporate Accounting), as well as modified the
underlying code to suit the companies needs
Automated Concepts Incorporated: Consultant
Client - Con Edison, worked on the NT roll out project. 2/1996- 9/1996
Responsible for the
development and roll out of NT Servers, and workstations. Responsible for the
development of security and auditing logs. Work closely with Con Ed staff to
fine tune overall network strategy. The technologies used were Windows NT
Server 3.51, Windows NT Workstations, Windows 95/Windows 3.11 Desktops, Oracle
7.1.6, UNIX, Framme, PCanywhere32, Irma, SNA Server 2.11, and OS/2 Warp
Connect. Supported 124 users and 7 servers/Windows NT 3.51. Designed the roll
out of internal mapping system for the Vision Project. Supervised the data transfers
and conversion from Oracle UNIX to Oracle NT, as well as the conversion to
Dbase III format for distribution to 16 bit systems. Implemented upgrades in
hardware. Implemented upgrades in operating systems, as well as software. Set
up two Compaq Proliant 4500 Windows NT
Servers (3.51) and 40 Windows NT Workstations (3.51) desktops. Installed and
tested service packs. Q+A Byers MapView and Databridge products.
Education
Additional completed Product Certification:
Windows NT 4.0 Track
|
Windows 2000/2003 Track
|
MS Proxy Server 2.0
|
Designing Windows 2000 Directory
Infrastructure
|
Internet Explorer 4.0
|
Designing Windows 2000 Security
Infrastructure
|
Internet Information Server 4.0
|
Designing Windows 2000 Network
Infrastructure
|
Exchange Server 5.0
|
Administering Microsoft Exchange 2000 Server
|
Windows Architecture 1
|
Designing Microsoft Exchange
2000 Infrastructure
|
Windows Architecture 2
|
Administering Windows 2000 Directory
Infrastructure
|
|
Network Engineer for Windows 2003
|
Completed - Windows NT 4.0 MCSE + I (# 313074)
Completed - Windows 2000 MCSE (# 313074)
Completed - Windows 2003 MCSE (# 313074)
Completed - Cisco CCNA
Completed – SMARTS level 1 Certification
Completed - Microsoft CRM
Installation & Configuration
Completed – Lefthand Networks SAN
Architecture
Completed – XIOtech SAN solutions
In Progress - Pursuing Cisco CCNP
In Progress - CISSP Certification
In Progress - Pursuing GIAC certification http://www.sans.org
http://www.giac.org
In Progress - Pursuing PMI certification
In-Progress – “EASY VISTA” certification
for Installation
In-Progress – “EASY VISTA” certification
for Configuration
Download Resume Format
0 comments:
Post a Comment