Sample Template Example of Beautiful Excellent Professional Curriculum Vitae / Resume / CV Format with Career Objective, Job Description, Skills & Work Experience for Freshers & Experienced in Word / Doc / Pdf Free Download
Wilmot , NH 03001
DARTMOUTH HITCHCOCK MEDICAL CENTER , Lebanon , NH 2010
– May 2011
Download Resume Format
Dana Nowicki
309 Kearsarge
Valley Road
603-748-9876
or 603-526-1230 maya@comcast.net
Summary
I’m a
Problem solver with significant experience developing solutions to
materials/operations problems employing a wide variety of ERP/MRP and other
software applications. In implementation
and support roles I have extensive experience coupling the tool with the goal
and developing the appropriate combination of process and metrics to insure
they support one another. I began my
career optimizing resources to solve problems as a Manufacturing Engineer and progressed to roles
gaining extensive experience as an ERP/MRP Process/System Analyst and team
leader. I’m skilled at identifying and
eliminating the ‘devil in the details’ of any process or support tools employed
to solve a problem.
Technical
ERP/MRP
Systems – SAP ,
BAAN, Rhythm (MRP based sys by i2 technologies), Oracle, VISIBILITY, COPICS
Health
Care Software – Epic Data Courier, Certified in Epiccare Inpatient
Procedure Orders (2009),
Database
Query/Analysis – ASC Sequel, SAP Query, Access, Impromptu, Safari
Process
Analysis/Modeling – Visio, ABC TOOLKIT, ARENA, ENVISION
(flowcharting), SIMAN, Minitab 14 (Statistical Process Control)
Windows
Software –
Excel, Access, Quattro Pro, Word, SharePoint, WordPerfect, Project Manager, One
Note.
Career History
SANMINA, Manchester ,
NH June
2011 - Present
Implementation
Coordinator
·
Support
the planning and scheduling of materials across 2 electronics plants for
various product lines.
·
Work
Closely with Program Managers to insure customer deliveries are met and
schedule change requests are satisfied to the best of the facilities abilities.
·
Maintain
and provide operational metrics for programs I was responsible for
Implementation
Coordinator
Project Position providing technical and configuration
support in the implementation of Epic software.
·
Member
of the team developing the change control and data migration process and
tools. Migrated data across environments
using Data Courier and development/maintenance of associated metrics.
·
Responsible
for technical support of team members in uploading and building appropriate
import/export files to support system build activities.
·
Responsible
for a subset of the Epic System list and orders build configuration and
maintenance.
TIMKEN AEROSPACE
BEARINGS DESIGN / MANUFACTURE,
Lebanon , NH 2008 –
2009
Principle
System Analyst
Provide analytical support to the Supply Chain and
Manufacturing Engineering Groups (AS400 Oracle).
MRP Metrics Development / Maintenance
·
Supported
implementation of the Rhythm MRP/Capacity planning tool.
·
Identified
critical fixed/variable offsets driving production scheduling.
·
Determined
offsets by a combination historical data analysis and interviews with ‘experts.
Data Integrity Monitoring and Correction
Developed and maintained a package of
exception queries using ‘Sequel’ to monitor scheduling and capacity planning
variables. Regularly ran these queries, identifying and eliminating multiple
data entry and download problems.
Product Structure Consolidation
Implementation: Coordinated
implementation of a new product structure and information flow between planning,
purchasing, and manufacturing departments. Administrative costs to manage
affected assemblies were cut in half and inventory of semi-finished parts was
significantly reduced.
Dana Nowicki Page Two
NORTHROP GRUMMAN 1998
– 2008
Senior Analyst Electronic Systems Division supporting the
SAP
ERP system 2003 – 2008 Linthicum, MD
Operations
Analyst Litton
Divisions supporting BAAN ERP system 1998 – 2003 College Park, MD
Planner/Analyst Denro Division 1996 – 1998 Gaithersburg,
MD
ERP System Support (1998 – 2008):
·
Worked
closely with functional departments and BAAN/SAP
consultants defining MRP, Materials and MES ERP applications/configurations and
implementation strategies to adopt.
·
Developed
business processes, integrating standard and customized SAP functionality by taking advantage
of the strengths and accommodating for the weaknesses of the ERP software
modules. Examples include a process to handle customer-owned equipment, a
Material Re-order System, and an automated shop order re-scheduling tool.
·
Documented
business processes and work instructions in SAP and Baan.
·
Supported
ERP implementation projects training users at satellite plants.
OPS Metrics/Data Integrity Development (1998 – 2008):
·
Utilized
‘SAP
Query’ to investigate questionable metrics to identify if the source was bad
metrics design or poor data.
·
Absent
adequate BAAN documentation or outside BAAN consultants, identified underlying
BAAN database relationships required for metrics development. Designed and
maintained Operations metrics and data integrity tracking reports in BAAN to
meet various departmental requirements including PIC , Manufacturing, Purchasing,
Inventory Control, Contracts, and Finance.
ERP Planning, MES, and Materials Support
(2004 – 2008):
·
Worked
on multi-functional IT/Business partner teams to resolve post ‘go-live’ ERP
problems as they occurred.
·
Identified
the root cause of procedural and software problems. Developed corrective recommendations and
implementation requirements for management.
Worked with IT, developing specifications for new customized code
requirements. Tested software changes
and updated related documentation.
·
Developed
common problem Identification/Solution reference documents for support
personnel while providing ongoing ERP help desk support to plants across the
country. Managed and participated in
regular audits of SAP
business process procedures. Provided
ERP training to individuals and groups.
Material Planner (1998 – 2003 Litton
Division): Planned for and
requisitioned general ‘line flow’ hardware used across multiple projects.
Planner
/ Analyst (1996 – 1998 Denro Division)
Coordinated manufacturing and purchasing operations to
meet program goals. I Served as Manufacturing and Purchasing representative on
product line teams responsible for ensuring system design, manufacture, and
delivery on time and on budget.
·
Created/maintained
MRP demand and supply.
·
Worked
closely with Engineering to ensure implementation of ‘Design for Assembly’
techniques.
·
Implemented
MRP and Inventory Control modules.
Defined, documented, and maintained MRP and Inventory Control
procedures. Created and maintained planning department ISO 9001 documentation.
·
Designed
and programmed custom Manufacturing, Purchasing, and Warehouse operating
metrics. Report topics included cost analysis, WIP status/progress/forecasts,
‘Action’ reports for production/purchasing departments, and other specially
requested program status reports.
Dana Nowicki Page Three
CINTAS INC., Landover ,
MD 1995
– 1996
Material
Control Manager
I Managed 14 warehouse/light manufacturing personnel
and was responsible for plant materials purchasing.
·
Designed/implemented
new process flows and Redesigned inventory location/identification system.
·
Improved
timeliness and accuracy of product delivery resulting in a significant decline
in customer complaints.
·
Created
and implemented a performance evaluation system, monitored work flow, trained
and oriented new staff.
·
Defined
product ordering and stocking rules..
ERNST AND YOUNG LLP, Baltimore ,
MD 1994
– 1995
Sr.
Management Consultant
·
Performed
quantitative analysis to forecast the financial impact of adopting
re-engineered business practices. Facilitated user sessions to design improved
business processes. Developed/implemented custom transition plans for various
Alexander & Alexander insurance brokerage offices in order to ease
conversion to standard, re-engineered business practices.
·
Performed
inventory control assessments, resulting in enhanced materials transfer and
purchasing procedures for an industrial and marine control manufacturer.
Identified set-up reduction opportunities. Re-evaluated manufacturing strategy
to identify outsourcing opportunities for select production steps.
MASLAND INDUSTRIES, Carlisle ,
PA 1991
– 1992
Value
Engineer
Operations Cost Reduction Specialist:
·
Created/justified/implemented
cost reduction programs in packaging and transportation that resulted in
savings of $500,000 annually. Operated as liaison between main manufacturing
facility and satellite plants to implement cost reduction programs.
·
Customized
application programs to support and coordinate product managers using Microsoft
Project Manager.
·
Customized
a ‘MOST’ analysis program using Microsoft Excel.
Education
MBA, Management and Technology,
Rensselaer Polytechnic Institute
Rensselaer
School of Management, Troy, NY, 1994
BS, Industrial Engineering, Lehigh
University, College of Engineering and
Applied
Science, Bethlehem, PA 1991
Download Resume Format
0 comments:
Post a Comment