ANNA SELMAN
SUMMARY:
I am Platinum level SAP Project Systems PS Functional lead, with additional design and
configuration expertise in IM, CO, FM Modules, and heavy exposure to AA, SD, MM,
HR, and FERC Modules, with over 20 years of professional experience and 13
years of SAP experience with extensive post production support. In addition I am certified in the PS, FI, CO,
IM and mySAP.com.
I have implemented SAP for organizations with international presence like
CA-Computer Associates, with projects in 79 Countries, IDB Development Bank
with projects in 55 Countries, and ABB with projects in more than 100
Countries. These international
organizations have complex requirements like one controlling area, multiple
company codes, multiple currencies; project accounting rules are not the same,
smooth and seamless intercompany processes are critical for the success of the worldwide
business
My SAP experience with 20 implementation projects and my deep knowledge
on how SAP modules integrate together and how they interface with external
systems will provide very valuable contribution to the client’s project,
Data Conversion: is a critical
task in the success of every SAP implementation project, my experience with
twenty SAP implementation projects will perfect guidelines to a smooth and
accurate transition between the old and the new processes
Project master data
Project balances, project
billing (actual revenues), project revenues recognized, COS, and actual cost
incurred, etc.
Open PO’s and open Purchase
requisitions (open commitments)
Internal overhead project
conversion
Assets projects conversions
I have one master’s degree in Civil / Structural Engineering, and another
master’s degree in Project Management and Control. I have worked in different positions in
various industries ranging from Public Sector, Utilities, Aerospace and
Defense, Consumer Product, Engineering and Construction, Service Providers,
Chemical Industries, with positions such as: Integration Manager, Team Lead
Consultant, Project Engineer, Structural Engineer with Scheduling and Planning
background for engineering projects, and Senior SAP Consultant for multiple
implementations.
TRAINING/CERTIFICATIONS:
SAP
Training - 1997
PS
Certified Consultant (SAP Academy, Waltham, MA)- 1998
IM
Certified Consultant (SAP Academy, Waltham, MA) -1999
FI- CO
Certified Consultant (SAP Academy, Waltham, MA) - 1998
Training
on ASAP (SAP Academy, Waltham, MA) - 1999
Certified
on My SAP.COM Workplace (SAP Academy, Waltham, MA) - 2000
WORK HISTORY:
- MIT Boston MA, November
2009 to Present
- Sumitomo SCS Waltham MA, June 2009 to
August
- Scientific Design, Little Ferry NJ, May 09 to
June 09
- Computer Associates CA, NY Dec 2008 - May
2009
- Perot Systems Charleston SC Oct. 2008 –
Dec 2008
- Century Aluminum Iceland, and Kentucky
USA March 2008 - November
- IDB Development Bank Jeddah Saudi Arabia
July 2007- March 2008
- BearingPoint - Professional Service
Industry November 2006 to June
2007
- CSC – Computer Science Corporation,
Invensys- Manufacturing Industry, Boston MA September 2005 to
November 2006.
- SAP America, Washington DC October
2004, to September 2005.
- IBM, - DETROIT EDISON, Detroit MI June 2004 to October 2004
·
US
ARMY, TACOM-ARDEC, A&D, IS Public
Sector, Picatinny Arsenal, NJ April 2004 – June 04
- ACCENTURE, SIEMENS, Orlando
FL. November 2003 to April 2004
·
US NAVY, Bearing Point (KPMG), A&D, IS Public Sector, April 2003 – Sep 2003
- CGEY- Cap Gemini Ernst & Young 2001- April 2003
Degussa
AG, NJ, Chemical, Engineering & Construction Industry
- Allied Domeq, Manufacturing, 2001
- ABB America, NC, E&C Industry, April 2000-
September 2001
- State of Connecticut, Public Sector, June 1999 -
March 2000
·
Raytheon, A&D Industry, 1998
- Allusuisse CO. 1998
- Plaut Consulting Inc., Internal Project for Plaut Company
Service Industry, 1998-2001
SAP EXPERIENCE:
MIT
Boston area, MA November 2009 to Present
Massachusetts Institute of
Technology is one of the leading Research and Development organizations in the
world, MIT is using Project Systems to manage projects for the clients. The
sponsors for these projects include government agencies like DOD, US Air Force,
US Navy, DOE, NASA, Department of Homeland Security, in addition to many
private companies involved with leading edge technologies. MIT has also internally sponsored projects,
like construction projects and maintenance projects.
SAP modules in scope: FI,
CO, MM, PS, PM, FM, SD, CATS. SRM and BI
are also implemented
Project Systems was
configured to allow the following:
·
Creation of project structure using WBS elements,
network activities, scheduling milestones, and payment milestones
Functions implemented:
·
Project cost planning with WBS
·
Project cost planning with networks
·
Project budgeting using various budgeting
functionalities like budget transfer, budget supplement, budget release, budget
carry forward, and availability control
·
Date planning on WBS
·
Scheduling with networks
·
Work force planning
·
Planning versions to accommodate various planning
scenarios
·
Project versions for reporting comparison
·
Project billing
·
Report painter reports
·
Report writer reports
·
Complex validation and substitution rules designed
to minimize users input, and minimize potential errors
·
Project settlement
·
Error handling procedures
·
Configuration documentation
·
Reviewing and approving training material
·
Data conversion of thousands of projects
Sumitomo
SCS Waltham MA June 2009 to August 2009
·
Sumitomo is the fourth largest company in Japan with
its consulting arm SCS
·
SCS is in the process of acquiring companies outside
Japan
·
One controlling area, multiple company codes
·
RRB Resource Related Billing for Intercompany
·
Results Analysis (Revenue Recognition)
·
Month-End process
·
Custom Reports
Scientific
Design, Little Ferry NJ May 09 to June 09
·
Scientific Design is a chemical processing company
founded by one of the team member of the Manhattan project, it is one of leading
companies in the production of Silver catalyst.
·
Participated in the blueprinting phase of the
project
·
Within eight weeks the PS blueprint was created, and
PS functions were configured and demoed
·
In the extremely short period given to the team, I was
able to configure the following
o Project
structures with various template
o Networks
o Cost planning on
networks for internal labor and external procurement
o Milestones
o Project cost
forecasting
o SD quotation
creation based on Project cost planning using DIP profiles
o RA- Results
analysis configured for the purpose of demoing the concept
o Report painter
report
·
CO profit center structure
·
CO cost center accounting functions demoed
Computer
Associates CA, NY Dec 2008 – May 2009
·
Design of Inter-company processes for CA
·
Company code in 75 countries, with corresponding
currencies
·
One controlling area
·
RRB Resource Related Billing for Intercompany
·
Results Analysis (Revenue Recognition)
·
Month-End process
·
Custom Reports
Perot
Systems, Charleston SC Oct. 2008 – Dec 2008
·
Blackbaud client is a professional services company
with companies in a few countries, they are already live since April 2008
·
I helped the client configure DIP profiles to meet
their requirements
·
Worked on exchange rate issues
·
Provided a list of processes to be implemented to in
the future phases of the project, like project milestone billing, and results
analysis
Century
Aluminum Iceland, and Kentucky USA March
2008 – Oct.2008
·
Century Aluminum is building a new two billion
dollars Aluminum smelting plant in Iceland that will consume one third of the
nation’s energy output
·
One controlling area for Century worldwide is being
used, one company code, one plant for the new smelter, and one profit center
·
Primavera is used by the EPCM company to manage the project
on a daily basis
·
Project planning, budgeting, availability control,
financial reporting, forecasting is done using PS
·
Purchase requisitions are created automatically
using PS network activities,
·
Assets under construction created automatically using
PS, and completed assets are created in PS procurement,
·
CO versions, project versions were used, PS
customized reports, using report painter, and report writer
·
Project conversion
IDB
Development Bank, Jeddah Saudi Arabia July
2007
to March 2008
·
SAP Solution Manager, scenario based solution
·
MM Procurement was configured, demonstrated, but not
used
·
Heavy usage of CO versions, PS customized reports,
using report painter, and report writer
·
IM / PS combined customized reports
·
Complex Substitution rules to handle large volume of
custom user field values, and facilitate PS IM integration and reporting needs
·
Various PS planning methods were configured
·
IM configuration, Investment Program structure,
planning, and budgeting
·
Integration with SAP RCM (Records and Case
Management),
BearingPoint,
Philadelphia PA September 2006 to June 2007
·
SAP Solution Manager, scenario based solution was
developed
·
SAP Implementation covers North America (US, and
Canada)
·
Project Scoping
·
Blueprinting
·
Functionalities: Project Systems, Customer Projects,
Capital and Internal Projects, Projects for special purposes,
·
Project Milestone and Periodic Billing, RRB,
Inter-company Process,
·
Results Analysis, Intercompany Results Analysis,
Reporting.
·
Customized PS reports with report painter, and
report writer
CSC
(Computer Science Corporation)– Invensys, Boston MA, Professional Service, and
Manufacturing Industry September 2005 to September 2006
·
Blueprinting using SAP Solution Manager
·
Implementing PS in 16 Countries
·
One Controlling are
·
COPA PS integration
·
Customer projects (Revenue projects) with Milestone
Billing, and RRB
·
R&D Projects
·
IT Projects
·
Warranty, Sales Assist, and Prospect Projects were
used
·
Complex Substitution rules designed to minimize
potential operator’s mistakes
·
RA , various Results Analysis Methods were used
like Revenue based, RRB,
·
Inter-Company
Billing
·
Customized
Reports
SAP America, Washington DC,
Howrey, Service Industry Nov. 2004 to Sept. 2005
- Blueprinting
SAP implementation project for a leading worldwide law firm based in DC.
With company codes in many countries
- Configuration
of PS, and CO Modules,
- PS / SD
integration using DIP profile for RRB (Resource Related Billing)
- Configuration
documentation using SAP Solution Manager
- Training
business analysts and power users
IBM, DETROIT EDISON, Detroit MI, (R3 4.7), June 2004 to Nov.2004
Working on configuration of PS, IM, FERC,
and CO Internal Order, and CCA Cost Center Accounting ( Allocation,
Assessment), tasks included implementing advanced Substitution and Validation rules,
complicated status management, interface with external work management systems,
month-end process, conversion.
- Writing functional specifications for ABAP programs
- Integration testing scenarios
- Security and Authorization
- Reporting and variants for various organizational units
US ARMY, TACOM-ARDEC, Picatinny
Arsenal, NJ April 2004 – June
A&D, IS-PS Public Sector Industry Solution, (4.6c and 4.7)
- I am tasked with configuration of advanced PS functionalities, and upgrade to SAP 4.7 release
- Network cost planning
- Workforce Planning, capacity planning
- Progress Analysis, EVM (Earned Value Management)
- Heavy Integration with FM and HR CATS
- Using OpenPS4MSP Version 2.01
- Interface with Winsight
- Evluation of IMPRESS Software for PS-P3 Primavera, and PS-Microsoft Project
- BW reporting
ACCENTURE, SIEMENS, Orlando FL. November 2003 to April 2004 (4.6 C)
PS subject matter expert for SIEMENS SAP
Implementation project
- VC (Variant Configuration) is being implemented
- Project Objects: WBS, Networks, sub-networks, PS text, Documents.
- Classification
- Dependencies
- Heavy integration with SD, projects are being created from sales order, and heavy integration with MM, BOM.
Bearing Point (KPMG) / US NAVY-
NAVAIR Washington DC – September 2003
Aerospace
& Defense Industry, Public Sector
- Involved in the SAP implementation project for the Department of Defense / US Navy NAVAIR, Naval Aviation Warfare Centers- Aircraft, Weapons and Depot Divisions, it is one of the largest SAP projects going on, and PS Module is the focus of the implementation
- Performed post-Production support, teaching SAP classes, conducting workshops, training Instructors
- Created improved and friendly solutions for complicated processes
- Helping in Month-end closing and reporting
- PS Configuration involved: Project Structure, WBS, Networks, Activities, Sub-networks, Activity Elements, Milestones, with advanced Validation and Substitution rules.
- Process Design: Project Creation, Plan, Budget, Execution (Confirmation, Earned Value Analysis, Scheduling, Purchasing, Goods Receipt, Payment, Invoicing, RRB Billing, Reporting, Closing)
- Heavy SD / PS Integration, using DIP Profile for RRB (Resource-Related Billing), and Periodic & Milestone Billing for reimbursable Naval Aviation Projects
CGEY/ Degussa AG, NJ
2001- 2003
Chemical, Engineering & Construction Industry
Sr. SAP Consultant (4.6C- PS, CO, IM)
- Completed my last tasks in a
large-scale R/3 4.6C implementation and integration project using PS and
IM for a multinational company with sites in Europe, USA, Canada, Mexico,
and Brazil, and revenues in excess of eighteen billion dollars.
- My role was to develop the
scope definition, then Blue print, Realization, Preparation for
Go-Live, and Post-Go-Live support.
- Also I developed training
materials, and conducted training for super users and end-users.
- I had a leading role in the
integration testing efforts, supervising the testing team to come up with
real life scenarios to challenge to system in close coordination with
teams from other modules.
- I had a leading role in the
data mapping design, conversion and migration efforts from the legacy
system to SAP, writing functional specification for ABAP programs, testing
the programs, and approving them, conversion of legacy data, structures,
actual costs and budgets, and open purchase orders (commitments)
- The Budget was configured to
meet highly demanding and complicated requirements: it can be derived from
an approved cost plan, or directly as original budget, and approved budget
can be released by people with authorization on a yearly or overall basis,
tools like budget transfer, budget return, and budget supplement,
availability control were very useful for the client
- The client uses PS to manage
the capital projects as complex investment measures, and Internal Orders
as simple investment measures; they are assigned to Investment Position of
the Investment Program (integration with IM-PS-CO and AA, the client had
the opportunity to evaluate the use of appropriation requests).
- The handling of Investment
program (Capital Investment) included program structuring (based on profit
center hierarchy), program planning, and Budgeting, program versions were
used.
- Investment program year-end
process included copying the structure to the next fiscal year, investment
measures budget carry-forward, and commitment carry-forward
- Customer project with RRB (SD
Resource-Related Billing, and Milestone & Periodic Billing)
(integration with CO-PA), and R&D projects, The work included
configuration of project profiles, investment profiles, settlement
profiles (complete configuration of allocation structure, source
assignment, and PA transfer structure for certain profiles), and planning
and budgeting profiles with yearly and overall planning and budgeting and
availability control activated. The
IM Module was configured to allow automatic creation of assets under
construction (AuC).
- Program variants and
selection variants were configured to facilitate PS and IO month-end
activities, PS reports were created using report painter. The data migration from the legacy
system AS400 to SAP was smooth and accurate, post-go-live support took one
month at the end of which we performed month-end process, and later
year-end process for 2002. As part
of my role I had to help setting up authorization profile, activity
groups, and assign user groups to profiles.
Plaut Consulting Inc., Service Industry, 1998-2001
Allied Domeq, Manufacturing, (2001)
Sr. SAP Consultant (4.6C- CO, PS)
- Configured the PS module to
meet the requirements of a consumer product company, and manage capital
projects, and expense projects.
- The project structure
included WBS elements, Milestones, PS text, documents
- Project settlements depending
on project types was designed according to CO-PA profitability segments,
and for certain project types to cost centers
- Preparation of Business
Process Procedures (BPP)
- Month-End closing, and PS
reporting.
ABB America, Raleigh, North Carolina NC, E&C
Industry, (2000-2001)
Sr. SAP Consultant (4.6B - FI, CO, PS, MM, HR-CATS)
- ABB with 148, 000 employees
and revenues about 40 billion dollars is considered one of the largest SAP
implementations and it is one of the first SAP PS module customers in the
world. ABB had a direct impact on
the design of PS module. On this
implementation we designed the project structure with WBS Elements,
Network activities, Network activity elements, Milestones, Documents, PS
Texts.
- The PS module was implemented
in close integration with HR CATS.
- Project scheduling was
configured using project planning board at the network activity level.
- Workforce planning was
configured to give the project manager complete control over the schedule
and the team assigned to WBS elements, using work center hierarchy and HR
work centers
- Workforce planning was
configured to give complete control and transparency to the work center
responsible person at any level.
- Other functionalities to be
mentioned is the configuration of the project billing:
- Periodic billing,
- Milestone billing
- Resource-Related billing
(RRB)
- Resource planning,
Scheduling, network planning, network costing, budgeting, security and
authorization, and PS-MM workflow, close integration with AA (Asset
Accounting)
- I had a leading role in the
business process reengineering for six different ABB Companies, and lead
the training efforts for super users and end-users. The
wide
knowledge in different SAP Modules made me one of the most reliable and
appropriate consultants for post-go-live support. This support is the most important
factor in the crucial transitional period between the legacy system and
SAP R/3 in any company.
- I was the only
consultant providing extended post-go-live support for PS, MM, CO, HR
CATS, FI-AP, FI-AR, SD, reporting.
State of Connecticut, Public Sector (1999 – 2000)
Metropolitan District Commission (MDC), Hartford CT
Sr. SAP Consultant (4.0B - CO, FM, PS, HR-CATS)
- Participated in full R/3 4.0B Public Sector implementation project using PS and FM modules for MDC (Metropolitan District Commission) Hartford, CT.
- Complete configuration of PS module
- Documentation and training
- Integration test scripts
- Creation and maintenance of
Funds centers, commitment items, assignment of commitment items to cost
elements
- Cost center planning,
budgeting
- Plan Distribution and
Assessment Cycles
- Actual Distribution and
Assessment Cycles
- Funds center planning,
budgeting
- Security and Authorization
using profile generators, creation of user menus, user maintenance
- Month-end process, Year-end
process
- Post-Go-Live support
for PS-FM-CO-CATS
Plaut Consulting, Inc. Service Industry (1998)
SAP Consultant (4.0B – FI, CO, PS, HR)
On this project
Plaut Consulting was the customer, my role was:
· Configuration of PS
· Configuration of CO-CCA, (Cost
Center Accounting) and CO-IO (Internal Order)
· HR Master data
maintenance
· Travel Management support
· Reports
I had
supporting roles on a number of other SAP implementation projects
Activities
involved setting up and configuring PS Module, helping with the writing of the
integration testing scripts, and preparing BPP (Business Process Procedures),
coordination with other SAP modules, Project Structure, Work center and HR
assignment, Project cash management, milestone and Resource-Related Billing,
Helping in design and maintenance of Material Master, Reporting, Task and
Resource driven Scheduling, Configuration of SAP Business Workflow in PS, and Security
and Authorization concepts, user maintenance, and PS BW (Business Warehouse)
ENGINEERING EXPERIENCE:
Stone & Webster 1995-1997
Assistant Project Engineer
Worked on
various Engineering assignments including the Central Artery/Tunnel Project in
Boston, MA.
Geotest Engineering Inc. Boston, MA 1991-1995
Civil Engineer
Bechtel – Spain 1989-1990
Assistant Project Manager
EDUCATION:
Northeastern University, Boston, MA, USA
MS degree-Engineering Project Management and Control
MS degree-Structural Engineering
Download Resume Format