Sample Template Example of Beautiful Excellent Professional Curriculum Vitae / Resume / CV Format with Career Objective, Job Description, Skills & Work Experience for Freshers & Experienced in Word / Doc / Pdf Free Download
Download Resume Format
ASHLYNN PHABIAN
44774 Burlington Dr.
Phone:
(586) 944-1234
Sterling Heights, MI 48121 Email: ashlynn@gmail.com
MANUFACTURING OPERATIONS
Productivity Improvement – Multi-plant Operations –
Manufacturing Systems – Material Control
“Hands on” motivated and trained professional Manager
with a commitment to quality, ethics, and goal accomplishment. Over 18
years of progressively challenging managerial, material and manufacturing
experience. Major strengths and demonstrated abilities in JIT, LEAN
management, human resources, labor-management relations, planning, quality
control using Six Sigma principals, communications, conflict resolution,
team-building, and goal setting and accomplishment, lean manufacturing, fi-fo
systems and total manufacturing structure. Outstanding vision in developing,
deploying and managing manufacturing strategies to achieve and sustain
productivity gains, cost reduction and quality improvements. Exceptional
leadership in managing functional departments while creating high performance
standards and driving accountability.
PROFESSIONAL EXPERIENCE
TDS/US
Automotive Warren MI
Sept. 06- Current
Operations/MP&L Manager
- Responsible
for operations for Tier 1 automotive plants (JIT) focusing in all areas of
business performance (Safety, Quality, Delivery, Cost, People, Lean)
- Develop
and review LEAN strategies and monitor to ensure proper implementation
using TPS system...
- Maintaining
a perfect schedule attainment of 100% and top performance on the customer
survey.
- Responsible
to report on all elements of the business, also meet with customer
(DaimlerChrysler) on daily basis to talk about strategies on new business.
- Responsible
for daily activity of 7 members of the staff and over 60 Union employees.
- Directly
responsible for all material movement and inventory control for 300,000
square feet of facility.
- Contribute
to budget planning for yearly goals.
- Evaluate
and plan career movement and succession plan for employees while
developing a “Team” building concept.
Triumph Group Inc. Tempe Az.
Mar. 06 – Sept. 06
OEM Manager (Aerospace)
- Complete responsibility for all
manufacturing operations ($17 million) including OEM Machining,
Commissioning, Shipping and Receiving. Assure that all schedules are
adhered to. Planning and execution of capacity plans, budgets for projects
and manufacturing departments.
- Responsible for Material movement
and control to ensure inventory and project material is on time and
accurate to BOM’s. (Bill of Materials).
- Champion all LEAN Manufacturing
projects and review to ensure all items are on track and valid.
- Reduce warranty by implementing
robust processes and corrective measures.
- Improved floor space savings of
over $200,000 Develop core business plan to improve manufacturing
achievements by 35% year end 2006.
Smith West Inc. Tempe Az.
Aug 2004-Feb 2006
Lead Manger
- Profit and
Loss responsibility for manufacturing operations-producing aerospace
components. Responsible for over $21 million in manufacturing operations.
- Inventory
control of aerospace material on a daily basis.
- Supervised
daily production and business requirements of entire plant to include 5
supervisors, 3 engineers and over 60 employees.
- Scheduled
production, and implemented “Five S” LEAN Manufacturing principles and
systems to meet business goals set for Safety, Quality, Delivery, Cost and
Morale.
Hayes/Lemmerz-Southfield Operations
2002-April 2004
Manufacturing Manager
- Supervised
the manufacturing of steering components meeting production schedules through effective supervision of resources including
6 production supervisors and 65-70 hourly employees
- Aggressively pursued world class safety and
housekeeping standards using “Five S” tools
- Train, coach, lead, and motivate employees
- Implemented team environments and concepts to
achieve goals with tools such as Kaizans, Green & Black Belt
Projects
- Reduced
manpower cost by 25% associated with Non-Value added processes
- Set goals and objectives on Lean Manufacturing and
Continuous Improvement projects
Daimler Chrysler – Mack Engine Plant Detroit, MI
2000-Jan 2002
Manufacturing Area Manager
- Profit and
Loss responsibility for engine block and crankshaft manufacturing
operations-producing 2,600 crankshafts and engines blocks a day
- Inventory
of over 7,000 engine blocks, and crankshafts and tooling material on a
daily basis.
- Supervised
daily production and business requirements of 2 departments, 6
supervisors, and over 100 UAW employees.
- Scheduled
production, and implemented “Five S” LEAN Manufacturing principles and
systems to meet business goals set for Safety, Quality, Delivery, Cost and
Morale.
- Reduced
costs by 10%, manpower by 7%, scrap by 17%.
Daimler Chrysler – Detroit Axle Plant Detroit, MI
1994-July 2000
Manufacturing Area Manager Sept.97-July-00
- Profit and
Loss responsibility for gear manufacturing operations-producing 6,000
gears sets a day and responsible for over $111 million in gear
manufacturing operations.
- Inventory
of over 30,000 ring gears, pinions, forgings, spider gears, diff gears and
tooling material on a daily basis.
- Supervised
daily production and business requirements of 4 departments, 12
supervisors, and 3 area managers and over 400 UAW employees.
- Scheduled
production, and implemented “Five S” LEAN Manufacturing principles and
systems to meet business goals set for Safety, Quality, Delivery, Cost and
Morale.
- Reduced
costs by 30%, manpower by 37%, scrap by 52%; reduced manpower costs in
areas by over $2.7 million. Improved FTC by 31%.
- Led 3
award winning teams that successfully fixed major bottleneck areas to
improve throughput by 26%.
- Implemented
projects, systems, Andon Boards, manpower strategies, and scrap reduction
with pull systems within assigned areas.
- Layout
improvements to free floor space using LEAN manufacturing concepts.
- Launched
production lines for several new front axles.
- Oversaw
installation of $15 million worth of new equipment and lines.
- Implemented
and maintained LEAN manufacturing concepts, new material flow and reduced
work-in- progress (WIP) inventory, FIFO and Kaizen systems, bank
maintaining and Kanban systems.
Lead Production Supervisor- CNC Machining and Assembly
April 95-Sept. 97
- Managed
the daily production of over 60 hourly UAW employees.
- Oversaw
the introduction of over $12 million worth of capital upgrades.
- Developed
scrap-reduction initiatives to meet departmental goals.
- Oversaw
all division inspection sheets and assisted management in cross functional
training of MQAS.
- Implemented
training procedures and reviewed all division on documentation procedures.
- Reviewed
Standard Work Instructions (SWIs) and control plans while making sure all
were current and correct.
Jobsetter CNC Equipment Mar 94-April 95
- Job-set
over 65 Phoenix Hobbing CNC machines and checked quality.
- Rebuilt
arbors and cutters.
- Troubleshooter
proportional changes from Zeiss Machine.
ADVANCED TRAINING AND DEVELOPMENT
Kanban, Toyota Production Lean Training, Statistical Process Control,
Kepner-Tregoe Logistics, Greenbelt certification, Andon Board Training,
MQAS/QS9000 Sexual Harassment, Smart Manufacturing, Tool Management, Selection
Interviewing, Sexual Harassment Training, Violence Prevention, Root Cause
Analysis, Powertrain Corporate Throughput and Lean Manufacturing.
Download Resume Format
0 comments:
Post a Comment