Sample Template Example of Beautiful Excellent Professional Curriculum Vitae / Resume / CV Format with Career Objective, Job Description, Skills & Work Experience for Freshers & Experienced in Word / Doc / Pdf Free Download
CERTIFIED PROGRAM MANAGEMENT
PROFESSIONAL EXPERIENCE
Rockwell Collins (Joint Venture – Vision
Systems International) – San Jose, CA Mar
2010 – Sept 2012
Pr. Program Management – Design and
Development New Display System
BAE - San Jose, CA July
2008 – Mar 2010
Danaher Corp – Hollister, CA June
2007 – July 2008
Program Manager – New Product Development and Product Delivery
BOEING CO. – Long Beach, CA 1998
- 2007
BOEING CO. – Long Beach, CA 1990
- 1998
Download Resume Format
Kaylie Catesi
Aptos, CA
831-662-9876 kaylie.catesi@gmail.com
CERTIFIED PROGRAM MANAGEMENT
Development and system
integration program manager for delivery of best-in-class products and services
in regulated environment. Lead
cross-functional domestic and international teams functioning across multiple
disciplines and sites ensuring smooth rollout of new product introduction (NPI).
Demonstrated
ability to get things done with a relentless approach to new products and
testing focused on the customer, system, and sub-system levels with an emphasis
on manufacturability and quality. Ability
to balance short and long-term strategic vision for strong presence in market
place with annual P&L
ownership of $5M to $100M.
Hands on
experience in creating strategies for programs and products; manage multiple
projects concurrently, ensure export and government compliance, effectively
communicate with executive and senior levels, prioritize resources, manage
expectations, and provide technical and change management expertise
PROFESSIONAL EXPERIENCE
Rockwell Collins (Joint Venture – Vision
Systems International) – San Jose, CA Mar
2010 – Sept 2012
Pr. Program Management – Design and
Development New Display System
Created and tracked multiple programs simultaneously, managed
interdepartmental inputs, identified and managed critical path(s), mitigated
risks (problem resolution), managed supply base, ensured testing followed requirements,
utilized design for manufacturing and assembly, and final program close out that
resulted in on time completion of the program.
· Managed diverse technical and business 17 member team from Israel and US that merged
hardware and software components into integrated system in 8 months
· Leveraged process improvements to reduce
cycle time by 35% and manufacturing costs by 14%
· Directed meetings and communications to executive
leadership and customer to ensure program objectives achieved high customer
satisfaction and quality rating for final product delivery
· Utilized operations background to mitigate
manufacturing issues
·
Prepared
proposals with program costs, justification, and ROI as part of presentation to
project sponsor and senior executives that resulted in over 80% contract awards
by the customer
BAE - San Jose, CA July
2008 – Mar 2010
Program Management / IPT Lead – Development Secured Network
Integrated off the shelf system into secured
network, assembled and led team as a cross functional integrated product team
(IPT), assign individual responsibilities, obtain task commitments, validate compliance
testing, manage critical path and risks, drive successful completion of
deliverables exceeding customer expectations
· Managed 10 member team of direct and
indirect members addressing program budgets, design for assembly, risk
analysis, and critical path scheduling to achieve timely program status
reporting, and completed objectives
· Built relationships with customers to refine
in short and long-term strategic product enhancements which brought about
requests for new proposals resulting in $10M in new business
· Implemented plan resolving difficult
personalities within team members to complete program on schedule
· Incorporated spiral development approach reducing
change management complexity
· Restored key supplier relationship strained
by prior program team
Kaylie Catesi 831-662-9876 kaylie.catesi@gmail.com Page 2
Danaher Corp – Hollister, CA June
2007 – July 2008
Program Manager – New Product Development and Product Delivery
Managed new product development, performance testing, and
recurring hardware delivery projects
·
Managed
both direct and indirect team reports for success oriented program execution
·
Led
assembly line Kaizen event reducing manufacturing time by 10%
·
Completed
30+ projects simultaneously accounting for 12% of division revenue
·
Developed
and managed new application with international supplier for UK and US adding
$8M of new business for subsequent year
·
Expanded
customer relationships leading to additional post-production sales
opportunities
·
Managed
monthly meetings addressing project status to leadership and customer teams
which resulted in high satisfaction ratings across each program and project
BOEING CO. – Long Beach, CA 1998
- 2007
Program and Project Management
Led multiple programs and projects for new business
development, system improvement changes, hardware upgrades, and equipment upgrades
·
Led
cross functional (matrix) teams, directed resources, planned projects, managed
technical and budgetary aspects, and established project success criteria to
exceed customer requirements
·
Leveraged
prior fabrication and manufacturing experience for critical path planning and
risk mitigations
·
Selected
and managed R&D solutions for executive reviews leading to new proposals
over $75M
· Coached project managers and lent
experience with difficult projects
· Formulated metrics, business unit goals,
and implemented corrective action plans needed to achieve on-time delivery and reporting
· Generated $50M in new business through
management of short and long-range business plans that aligned business unit
and corporate strategies across 306-person integrated product team (IPT)
· Managed and tracked project costs using
earned value methodology (EVM) and integrated master schedules (IMS) leading to
90% status response accuracy
BOEING CO. – Long Beach, CA 1990
- 1998
Design and System Engineer
Led multiple projects
incorporating design for manufacturing and assembly, quality improvements,
variability reduction, system design changes, and cost redesigns
·
Leveraged
lean/six sigma principles to improve manufacturing performance by 10%
·
Reduced
unit cost by $250K through design and quality improvement initiatives
·
Utilized
new composite materials to reduce system weight by 50 lbs saving the customer
$500K in costs
·
Simplified
component fabrication process that shortened operations span time by multiple
days
·
Managed
in-house contractors and subcontractors for on-time delivery of small projects
EDUCATION
Certified Program
Management, PMI organization
Masters Business
Administration, Entrepreneurship emphasis, Pepperdine University, Malibu, CA
B.S., Engineering
Physics, Westmont College, Santa Barbara, CA
Download Resume Format
0 comments:
Post a Comment