Danna  Hiemstra
Construction / Project Manager
danna.hiemstra@gmail.com
[269]207-9876

Professional Profile
 Mr. Hiemstra has more than 40 years of experience Project management. Construction management, mechanical and process piping, waste water treatment, CIP skids, skid systems   His experience has included working with a wide range of food and beverage processors. He has worked closely with plant, engineer and maintenance managers to identify operational needs and manage the implementation and installation of new process and utility piping and support equipment. His expertise includes project/construction management and the fabrication and installation of new equipment and the managing of start-up schedules.  He also has been involved in the relocation of existing plant equipment. Key project experience includes specializing in custom fabrication of food grade stainless conveyors, stainless steel tanks, food processing equipment and platforms.  He has been involved in construction oversight and project management of new manufacturing plants for the beverage industry, salt industries, cheese industry, and food processing plants.  He designed and fabricated the only USDA approved Nitrogen Freeze tunnel.

Skills
·                    Software MS Project, Excel, Power point, Word, Auto cad, Blue print reading, Fabricating, Welding mig, tig, stick, purge welding, Stainless steel, Mild steel.

Related Experience
Food and Beverage Processing and Manufacturing
·                   Morton Salt MVR project Grand Saline Texas.    Project /construction manager for the construction and commissioning of the new MVR system, design and manufactured by GEA. This salt crystallization process is new to the states and this is the first one installed. Ran 12750 KVA power to the new plant under ground. Spent time at the office of GEA to get acquainted with the equipment and help in the piping layout and assisted in the evaluation of the bids for the design build contractor contract. Responsible for working with the Project engineer from GEA, representing Morton Salt and reporting to the plant manager and their construction engineer from Kansas. Ordered the job trailers and set up trailer park for construction  Reported all construction activities and made certain that the design build contractor worked safely [note: this was an MSHA project] Had weekly job meeting with contractors, filled out daily reports that included: change orders, request for information, a daily time log safety logs, safety training with Morton, receiving reports, welding coupons, welding test, welding passivation, welding log, MSDS sheets, weather reports, change order both from the contractor and the owner. Received materials and transfer them to the contractor by transmittals. Inspected all steel work and concrete work, and test reports for the steel and concrete. Worked with Morton on the removal of their old boiler and the asbestos removal. 
  • Coca-Cola North America, Grand Prairie, Texas.  Project/Construction manager for the construction and commissioning of a high-speed bottling line.  The new line included additional blow molding, filling and packaging capacity.  The line was designed for a 1080 BPM nominal bottling capacity.  In addition, the infrastructure and electrical services were upgraded to supply the necessary power and utility capacity for the bottling equipment.  The project included installation of Coca-Cola North America purchased packaging equipment.  The line was started up with qualification efficiency greater than 95% and ahead of schedule by 4 weeks. Responsibility for all construction aspects and the setting of job trailers, telephone intranet service’s, waste hauling, and port a john service, getting construction permits for the project, and working with all of the inspectors, Worked with the electrical company on the new under ground runs needed for the new electrical service for the plant, Responsible for the new drain lines and sump system for the parking lot, also had daily meeting with the plant and contractors, weekly meeting’s with the engineering group, Also set up the technical support groups for the equipment qualification runs. The number of contractors on this project  ran 15
  •  Tropicana: City of Industries CA.  Project Manager for GEA/NIRO under Onsite Service at the Naked Juice Plant in charge of the Utility and Process lines as well as setting the Tanks and Platforms. Keep records for weld map, daily times, and material delivery’s.  Set up log for following the extras for the subcontractors as well as the materials used on the project also the setting of job trailers service, intranet service, and waste hauling, ordering of the copy machine and providing the new prints for the piping layouts, revise platform layout with the engineer to meet CA. requirements’. Daily meetings with contractors to keep them on schedule and weekly meetings with Tropicana engineers also daily meetings with the general contractor so that each trade would be able to keep their schedule with so many men on site and working in the same area, scheduling the time frame of the project to meet end dates for the start up, helping the Technical group with start up. The running of the night shift when it was needed. Helping with the safety programs scheduling for the contractors that was needed for Tropicana. Responsible for the Inspection of purge welds for the lines as well as the orbital welds. Worked with Tropicana on the bore scoping of the lines to make sure they met the requirements of the project. Responsible for keeping the storage yard neat and clean for health and safety. The number of contractors for GEA on this project was 2 with 6 sub contractors under the two main contractors.
·                   GEA quote the following project :
                 Leprino Foods:
                         Platform for their new Plant
                 Earthrise Nutritionals LLc Project:
                         New steel to match the existing unit for cyclone in Calipatria CA  
                 DSM Allentown PA: 
                         New cyclone and steel work
                 Givaudan Project:
                         Quoted the process piping and the utility piping
·                   Dannon-Minster Ohio. Project manager for GEA under Onsite Service For the installation of the Skim Milk Tank Burst Tank Rinse Project:  Over saw the installation of the Valves and piping system. Valve validation and first run. GEA had only 2 contractors on site
·                   Nestle Waters: Greenwood IN. Project Manager reasonable for the install of the high speed water line. In charge of the utility and process and package lines as well as the pipe racks. This plant was design with all equipment free from the roof supports.  Responsibility for setting trailers, telephone intranet service’s, waste hauling, and port a john service, getting construction permits for the project, and working with all of the inspectors. Worked close with the general contractor to keep the short time schedule on track as well as keeping the customers changes to a minimum. We had 22 contractors on site at the peck of this project.
·                   Leprino Foods – Allendale Michigan Plant.  Project Manager on this new building for Leprino in charge of the process piping and platform work, help with installation of the dryer and evaporator system. We had 4 process contractors working on the piping as well as 6 contractors installing the platforms. For the Dryer system we worked with the contractor from over seas and supplied welders for them. Leprino Foods had their Owen Project engineers on site and I worked with them each day on schedules and man power. This was a completely new and the first major project for Leprino Foods and Michigan Dairy
·                   Leprino Food: Conveyor Fabrication – Remus, Michigan.  Project manager involved in the design, fabrication and installation of process equipment.  Fabricated conveyors, process piping, tanks, platforms, walkways and safety guards for the cheese processing.  Oversaw the installation of the new equipment and ensured adherence to the start-up schedule. This was a complete remodel project for Leprino Foods from the ground up. The number of contractors on site ran 12
·         Ice Mountain/Nestlé Waters: Platform Fabrication - Mecosta Michigan.  Project manager for the fabrication and installation of platforms and carts.  Engineering work also included the fabrication and installation of conveyors and walkovers.  The project required the management and coordination of contractors.
·         Dairy Farmers of America: Process Piping– Goshen, Indiana.  Project manager involved in the installation and fabrication of process piping, platforms and safety guards.  Project encompassed dryer modifications used in the production of powered milk.
·         Kent Quality Foods: Stainless Fabrication– Grand Rapids, Michigan. Project manager responsible for the fabrication of various stainless machines to facilitate in the process of producing hot dogs.  Engineering work included the fabrication and installation of process piping.
·         Butterball Farms: Nitrogen Freeze Tunnel – Grand Rapids, Michigan. Project manager responsible for the design and fabrication of the only USDA approved Nitrogen Freeze Tunnel for quick freezing of butter used in restaurants.
·         Elan Nutrition: Meeting USDA Standards – Grand Rapids, Michigan.  Project manager responsible for ensuring the plant updated and reworked machinery to become USDA compliant.  Engineering work included the plant upgrades, installation of equipment, tanks and a CIP system.
·         Corium International: Tank Fabrication, Grand Rapids, Michigan.  Project manager involved in the fabrication of tanks and mixers for the pharmaceutical industry.  Responsible for contract coordination and start-up scheduling.
·         ConAgra Foods: Process piping fabrication – Holland, Michigan.  Project manager responsible for fabricating process piping, holding tanks for both cream and acid for solution.
·         Chef Solutions: Potato Mixer Design – Dolphis, Ohio.  Project manager involved in the design and fabrication of a continuous feed potato mixer.  Engineering work also included the design and fabrication of process piping and platforms.
·          HC Brill: Conveyor Design – Atlanta, Georgia.  Project manager involved in the design and fabrication of conveyors used in the bakery plant.
·         Hudsonville Ice Cream: Machine Modifications – Holland, Michigan.  Project manager responsible for the design and fabrication of conveyors and platforms. Coordinated equipment upgrades and modifications to existing ice cream machines and the setting of silos.
                                                          


Download Resume Format 

0 comments:

Post a Comment

Resumes By Categories

1-5 Years Experienced CV 10-15 Years Experienced CV 10th Standard 12th Standard CV 15-20 Years Experienced CV 20-25 Years Experienced CV 30+ Years Experienced CV 5-10 Years Experienced CV Accounts CV Aeronautical CV Automobile Engineer B Com CV B Pharma CV B.Tech CV BA CV BA Philosophy CV Banking CV BBA CV BBM CV BCA CV BDS CV Beautiful CV Bio Technology CV BMS CV BPO Call Center CV BSC CV BSC IT CV Business Analyst CV CA CV Cashier CV CEO CV CFA CV Chemical CV Civil Engineering CV Commercial CV Cook CV Cover Letter for Resume CS CV D Pharma CV Diploma CV Doctor CV draff Economist CV Electrical CV Electronics CV Engineer CV Fashion Designer CV Films CV Finance CV Foreign Resume Format Fresher CV GM CV Hotel Management Housekeeping CV HR CV ICWAI CV Import Export CV Industrial Engineering CV Instrumentation CV Insurance CV IT CV ITI CV journalist CV LLB CV M Com CV M Pharma CV M Phil CV M Sc Computer Science CV M Tech CV M.Tech MA CV Manager CV Marketing CV Mass Communication CV MBA CV MBA Event Management MBA Finance MBA Hospitality CV MBA HR CV MBA IB cv MBA Marketing MBA Production MBA Quality MBA SCM CV MBA System MCA CV Mechanical CV Medical Representative CV Mining CV MMS CV MS CV MSC CV Over 25 Years Experienced CV Paint Technology CV Pharmacy CV Phd CV Philosophy CV Project Manager CV Psychology CV Purchase CV Quality Engineer Real Estate CV SAP ABAP CV SAP Basis SAP BI CV SAP BO CV SAP CRM CV SAP CV SAP FICO CV SAP HR CV SAP MM CV SAP PP CV SAP SD CV SAP Security Six Sigma CV Special Resume System Administrator CV Teacher CV Textile CV Treasury CV USA Resume Web Designer CV