P.O.Box 324
Estury Drive,Oregon 35022-1124
Structural Designer
MEMBERSHIP IN PROFESSIONAL ORGANIZATIONS
American Society of Certified Engineering Technicians
National Institute for Certification in Engineering Technologies
CERTIFICATION & REGISTRATION
Engineering Technician Certificate 23147 Civil Technology
ACADEMIC ATTAINMENT & COMPUTER SOFTWARE KNOWLEDGE
Graduated Benson Polytechnic School Portland Oregon
Attended University of Illinois Chicago Extension Division
Completed courses on reinforced concrete design & steel & timber design
Received 40 Hours PDS/Frameworks Training at Bechtel
Microsoft Word, Excel & Outlook Express proficient
Received Pelican Forge Pipe Support Modeler & Pipe Support Manager
Software Training at Bechtel
SUMMARY OF WORK EXPERIENCE
40+ years of diversified experience in the engineering profession
with emphasis on industrial projects. This experience includes the total
responsibility for projects, client contact & the preparation of design &
construction drawings, from project level through detailing, estimating,
material take off, field work, inspection, computations, checking & other
items necessary for the completion of the work listed under recent
experience. All types of STEEL or CONCRETE drawings; capable of checking
all types of civil & structural drawings, vendor drawings & other
disciplines. Working knowledge of 3D PDS/Frameworks, Microstation &
AutoCAD. Fast Track project teams. Working knowledge of AISC Steel
Manual & Uniform Building Code. Strong working knowledge of discipline
specific skills, codes & standard practices. Strong leadership skills,
good written, verbal, analytical & interpersonal skills. Ability to
organize & prioritize work & meet deadlines. Performed work that involved conventional
RECENT EXPERIENCE
April 2009 to May 2011
January 2009 to March 2009
On contract to ASRC Energy Services Anchorage Alaska.
On-Shore & Off-Shore
Principal Civil/Structural Designer assigned as a checker to The Eni
Petroleum $1.45 Billion Nikaitchuq Oil Field Project North Slope Alaska
Check Fabrication & Construction Packages (Modules) for Accuracy & Quality
Checked Shop Detail Drawings CH2M Hill Alaska Fabrication Facility
Checked Shop Engineering Drawings Parker Drilling Company BP Liberty
Switchgear Module
April 2006 to January 2009
Full time employee at Augusta Engineering & Design Inc., South
Charleston, West Virginia - Senior Civil/Structural & Lead Designer/Checker
Worked on Natural Gas Compressor Stations for Columbia Gas Transmission
of Charleston, West Virginia & Dominion of Clarksburg, West Virginia.
Duties included preparation of Structural Steel & Reinforced Concrete
drawings, using Microstation & AutoCAD2006. Additionally I checked
engineering & vendor drawings & made trips to the job sites. Strong PC & MS Office
Platforms, Pipe Supports, Buildings, Tanks, Platforms & Equipment
Foundations. Site & Plot Plans. Worked with Reg. Professional Engineers
on detail steel & concrete design. Worked closely with Piping &
Electrical departments & other disciplines, to insure good design &
quality construction drawings. Upon completion of the Hardy County West
Virginia Compressor Station Project, I personally delivered all drawings
to the client at the job site. I am frequently required to work on
multiple project tasks at the same time & translate documents into PDF
files to share with coworkers, vendors & clients via e-mail. Starting
July 2006 I was promoted to Lead Civil/Structural Designer on the
Dominion cove Point LNG, LP Air Separation Unit Project, located in Lusby
Completed The Empire Pipeline Project. Oakfield Compressor Station,
Genesse County New York(AutoCAD 2006) & Spectra Energy Steckman Ridge
Natural Gas Storage Project located in Bedford County, Pennsylvania
(Microstation V8.)
Assigned to the Bayer CropScience Project located in Institute, West
Virginia. Was the Lead Structural Designer for the project.
March 2004 to April 2006
On contract. Bechtel National Inc.
Assigned to work with Pipe Support Group as a Senior Plant/Piping
Designer using PlantSpace (PSDS), Triforma & Microstation/J. Preparation of Pipe Support Drawings using PlantSpace & Intergraph Support Modeler~Pelican Forge~Project for the U.S.Dept. Of Energy (D.O.E.)Hanford-Nuclear-Washington State.
July 2002 to March 2004
Contract field assignment at Bechtel National Inc. Engineering & Construction working on job site as Senior Field Construction/Civil/Structural Engineer-Designer.
May 2002 to July 2002
Senior PDS/Frameworks/Microstation/Structural Designer
On contract to ABB Lummus Global Inc., Bloomfield, New Jersey & Houston, Texas. Working with client form China to develop final PDS/Frameworks Models & Drawing extractions for Microstation presentation. Some AutoCAD drawings. Generated interference envelopes & created freeze files for each model. Verified each model & corrected overlapping members. Worked close with piping & mechanical plant layout groups. Shanghai Hanghai Ethylene Cracker Complex, Caojing, Shanghai, P.R.C. Shanghai SECCO Petrochemical Co. Ltd. Gas Fired Recycle Cracking Heater.
February 2002 to May 2002
On contract to Jacobs Engineering & Construction Company
Mid Ohio Valley Region. Cincinnati, Ohio - Senior Structural Designer Modeling in PDS/Frameworks & extracting views for drawing presentation. Made trip to plant site with project team to collect field data & performed duties on survey team. Completed site plan & general notes drawing. Completed Hazard Material Training prior to visiting plant site & completed tests given in office & at the plant site. Prepared Building Addition Foundation Drawing Plan, Sections & Details. Prepared Tank Farm Mat/Slab & Foundation Drawing Plan & Pipe Supports. Sections & Details as req'd. Referenced in piping & mechanical layout files. Made drawing file changes to additional AutoCAD drawings in model space & paper space. Then issued drawings for construction.
January 2002 to February 2002
On contract to Kellogg, Brown & Root Engineering & Construction Company - Senior Structural Designer as related to the oil & gas industry offshore shipboard project. Responsibilities included structural steel module units for shipboard installation, piping & electrical & equipment supports, pipe rack layout. Modeled in PDS/Frameworks & extracted views for drawing presentation.
July 2001 to January 2002
On contract to Parsons Infrastructure & Technology Group Inc. - Senior Civil/Structural Designer worked with Jacobs Facilities Inc. University of California/United States Department of Energy's Lawrence Livermore National Laboratory, Livermore California. PDS/Frameworks, Microstation & Plant Design Review. Field assignment at project site. Structural Steel supports for electrical cable trays & equipment; pipe supports & hangers. Some as build drawings & interfaced with other disciplines, engineers, construction & 3D model for the National Ignition Facility (a state of the art program to house the world's most powerful laser). Extended three times to assist on final construction details.
March 2001 to July 2001
On contract to VECO Engineering & Construction Co.
CH2M Hill - Principal/Senior Structural Designer Off shore work for BP Exploration North Slope Alaska using AutoCAD 2000.
Northstar, Seal Island, Prudhoe Bay. Developed & provided details for moderate structures, roads, dikes & drainage layouts. Gathered information from all sources required including existing facilities, other disciplines, vendors, engineers, reference drawings & catalogs to produce complete, functional & constructible design packages. Constructed scenarios from various information sources, considered alternatives, develop details & follow through with solid workable solutions for design problems. Operated without supervision on projects. Knowledge of cold regions requirements & BP Exploration & Alyeska Pipeline Service Co. standards. Modular Skid Mounted Units & Surface Equipment a big part of these projects.
January 2001 to March 2001
On contract to Aker Kvaerner Engineering & Construction Co. - Senior Structural Designer using PDS/Frameworks & Microstation in the preparation of 3D models & drawing files for Honeywell Chemical Plant Expansion Project. Geismar, La. Structural Steel & Reinforced Concrete.
November 2000 to January 2001
On contract to Watkins Engineering & Construction Co. - Senior Structural Designer using Microstation.
Fieldwork at Buckeye Plant, Perry, Florida preparing designs for pulp & paper mill.
August 2000 to November 2000
On contract to I.D.E.A. Associates Engineering Co., Guilford, CT. Job was for Jacobs Engineering & Construction, Houston, TX. Senior Structural Designer using PDS/Frameworks & Microstation. GE Plastics Chemical plant expansion project while working with equipment layout & piping designers & engineers on the construction of 3D models. Worked on placement of building grids, walls, columns, beams, vertical & horizontal bracing, floor STEEL, slabs, pads, walls, solids, cutout's, pipe sleeves, stairs, ladders, handrails & toe plate, access grating floor, pipe racks, supports & other items necessary for complete frameworks model & finished drawing files. Updated & generated frozen views & create envelope files for interference checking.
July 2000 to August 2000
On contract to Washington Group International Inc., Huntington, West Virginia - Senior Civil/Structural Designer using AutoCAD & fieldwork for PPG Plant. Preparation of foundation plans, sections & details. Structural Steel & underground piping & drain trenches.
April 2000 to July 2000
On contract to Rolls Royce Marine South Florida - Senior Designer using Microstation J & Triforma. Ship lifting industry preparation of drawings. 550 & 610-ton hoists & associated structural steel. Detailing parts & assembly drawings.
May 1999 to April 2000
On contract to British Nuclear Fuels, Richland, Washington - Lead Structural Designer using Intergraph Frameworks & Microstation, Structural Triforma & Plant Space. Project: hazardous waste material. High-level nuclear waste. Nuclear waste Vitrification River protection waste treatment plant Dept. of Energy, Hanford, Washington. Prepared drawing extractions, 3D Models in PDS Frameworks & Triforma Annotation. Building of Frameworks Models. Composing Drawings. Generate Construction Documents. Develop section cuts & put on drawings. Supervised & checked work of other designers. Many seismic details. Attend CAD Lead Meetings & coordinated efforts with layout & other departments.
October 1998 to May 1999
On contract to Brown & Root Engineering Construction Co., Mobile, Alabama - Senior Civil/Structural Designer using PDS/Frameworks & Microstation. Structural Steel & Reinforced Concrete drawings for Vulcan Chemicals Chlor-alkali Expansion project, Geismar, Louisiana. Piling location, pile caps, grade beams, foundations, slabs, pipe racks & building Steel. Some drawings prepared using AutoCAD. Document extraction, inter-discipline coordination. Completed 2D cad dimensioning, annotation, design sections & details.
January 1998 to October 1998
On contract to The BSI Group, Derwent, Ohio. Work on projects for Texas Eastern Transmission Corp (a subsidiary of Duke Energy Corp), Houston, Texas.
Senior/Lead/Civil/Structural Designer in charge of all civil & structural drawings. Approx. 300 drawings on two natural gas compressor stations.
Gas City, Grant County, Indiana & Glen Karn, Drake County, Ohio, Compressor Stations. These drawings were prepared using Microstation.
Reinforced concrete & structural steel. I supervised the work of other cad designers & worked very close with other disciplines.
October 1997 to January 1998
On contract to Engineering Dept. Proctor & Gamble, Cincinnati, Ohio - Senior/Lead Structural Designer using PDS/Frameworks & Microstation. 3D modeling of building structural steel, piling & reinforced concrete foundations & slabs. Proctor & Gamble paper plant, Cape Girardeau, Missouri.
December 1996 to October 1997
On contract to Fru-Con Engineering Dept. St. Louis Missouri - Senior/Lead Structural Designer using AutoCAD. Prepared structural steel & reinforced concrete drawings for the reopening of a pet food plant. I prepared drawings for the grain grinding building, the rail car unloading facility, conveyor & pipe supports, equipment supports, access platforms, stairs, handrails & ladders, floor, elevated slabs, roof slabs, the freezer building, in ground waste water treatment facility. Working with the Lead Structural Engineer we developed a drawing list & estimated the hours & manpower to complete each area. I made two trips to the job site. First to inspect the plant & grounds prior to construction & later to inspect several items & to inspect the precast concrete roof & wall panels. Fast track projects & required much coordination with the other disciplines, as well as the client & field personnel. Additionally I prepared drawings using Microstation & Frameworks. These included structural steel utility rack for the wastewater treatment area of the MEMC Electronic Materials Inc. plant at O'Fallon, Missouri.
August 1996 to December 1996
On contract to Proctor & Gamble Engineering Department, Cincinnati, Ohio - Senior Civil/Structural Designer using PDS/Frameworks & Microstation. Intergraph generated drawings for Proctor & Gamble.
January 1996 to August 1996
On contract to Washington Group International, Cleveland Ohio - Senior/Civil/Structural Designer using AutoCAD. For Chevron Chemical Co., on Polystyrene Plant, Marietta, Ohio. Reinforced Concrete & Structural Steel drawings. Also worked as Pipe Support Designer involved with the design of over 1,000 small & large bore pipe supports at an Ammonia Plant for Dakota Gasification Co. Beulah, North Dakota.
June 1995 to January 1996
On contract to Basic Systems Engineering & Construction Co., Derwent, Ohio - Senior/Lead Structural Designer using AutoCAD. Structural Steel & Reinforced Concrete drawings for Shebelinka Gas Refinery Catalytic Reforming Unit, Chevonii Donets Ukraine. Equipment & vessel supports, pipe racks, access platforms, buildings, ladders, stairs, pipe supports, all civil/structural steel & concrete in plant. Worked very close with other disciplines.
1991 to 1995
On contract to Foster Wheeler, Clinton New Jersey - Senior Civil/Structural Designer
1989 to 1991
On contract to Washington Group International, Cleveland Ohio - Senior Civil/Structural Designer
1987 to 1989
On contract to the Celanese Celco Plant in Narrows, Virginia - Senior Civil/Structural Designer
1980 to 1987
Various Contract Assignments with MTI & CDI of St.Albans, West Virginia & worked direct for
Lilly Engineering, Beckley West Virginia
1970 to 1980
Various Contract Assignments in & around the Chicago, Illinois Area & worked direct for
Brown & Root Midwest Engineering Center
1967 to 1970
Various Contract Assignments in & around the Portland, Oregon Area & worked direct for
Swan Wooster/Sandwell Engineering & General Drafting Services
1960 to 1967 Was a member of the United States Military
Prior to 1960 Was a student
Download Resume Format
0 comments:
Post a Comment