Make A Curriculum Vitae Online For Project Manager in Word Format Free Download -->

Make A Curriculum Vitae Online For Project Manager in Word Format Free Download

Sample Template Example of Beautiful Excellent Professional Curriculum Vitae / Resume / CV Format with Career Objective, Job Description, Skills & Work Experience for Freshers & Experienced in Word / Doc / Pdf Free Download


Daniel Werley
20151 Holly Ct. Drive  Brooklyn, Sn 65210
Cell: (510) 510-2721,
E-Mail:daniel.w110@gmail.com 
OBJECTIVE
A career opportunity that builds on my diverse Management and Engineering experience to meet new and unique challenges
CAREER SUMMARY
Twenty + years experience in project management, refinery retrofit projects, facility design, engineering team leadership and team building, client/stakeholder relations, enhanced recovery, production/reservoir/arctic/environmental engineering, pipeline design, compressor facilities, budget preparation, contract administration. 
WORK EXPERIENCE
Sr. Project Manager (2011-Present)
Universal Pegasus (Houston, Texas)
·         Seconded Project Manager for Talsman Energy USA. Performed FEL design of surface production and treating facilities for Talisman's Eagle Ford development program. Directed field implementation and coordinated Universal's engineering design efforts.
Sr. Project Engineer (2010-2011)
Maverick Engineering(Corpus Christi, Texas)
·         Project Manager for refinery retrofit projects for Flint Hills Corpus Christi refinery. Coordinated design of 36" flare header replacement in the Flint Hills West refinery.
·         Project Manager directing engineering design of multiple liquid pipeline modification projects for Koch Pipeline Company.
Project Manager (2001-2009)
Anvil Corporation (Bellingham, Washington)

·         Project Manager directing multiple design teams to develop fast track T/A projects for Shell PSR Refinery.  Included in this portfolio was the emergency replacement of a severely corroded flare header, which was performed while plant operations were ongoing.  
RESULTS: The project allowed production to be maintained during a difficult installation, precluding a plant-wide shutdown.
·         Seconded Project Manager on site at BP Cherry Point Refinery, Blaine Washington.  Project Manager for installation of a cutting edge nuclear fluid interface instrument in Cherry Point's desalter vessel.
RESULTS: The project received BP's Helios Award as the best project in a field of 1600 competing projects.
·         Project Manager for design of a refinery sulfur gathering and treating system in Washington.   Interfaced with client engineers to optimize project scope, schedule and budget.  Supervised multidiscipline consulting team that executed detailed engineering design. 
RESULTS: The project was completed on time, 10% under budget and achieved an IPA "best in class" rating.

Sr. Engineer/Staff Engineer/Team Leader  (1993 - 2001)
Coastal Oil & Gas Corporation  (Denver, Colorado)
·         Project Manager responsible for the design, construction and start-up of 80 mile gas compression/gathering system in eastern Utah.  Developed system design and implemented dual pressure design, optimizing compression usage.  Supervised engineering contractors and coordinated field installation. Administered budget preparation/cost containment programs. 
RESULTS: The project achieved 20% savings over original estimates.
·         Certified design of field fabricated compressor scrubber vessels. Developed computer program to perform ASME Boiler and Pressure Vessel design calculations.  Coordinated with State of Utah officials, ensuring vessel compliance with State and National Board standards.
RESULTS: Saved $50M by eliminating the need for scrubber replacement.
·         Coordinated equipment procurement and contract administration for installation of 16-lease compressor facilities in eastern Utah.  Modified existing gathering system to accommodate the required units and supervised equipment installation. Ensured compliance with BLM/BIA environmental laws, including archaeological and antiquities preservation laws. 
RESULTS: Project increased production by 15% over previous levels.
·         Developed engineering analysis and economic justification for NEPA Environmental Assessment of field expansion in Utah.  Supervised preparation of alternative plans of action and assessed optimum development recommendation for submission to BLM, BIA and US Fish and Wildlife administrators.
·         Project Team Leader assessing production operations in Montana, North Dakota and Wyoming.  Directed staff of eight engineers, geologists and field foremen that developed a production exploitation program.   Implemented new hydraulic fracturing techniques that enhanced well performance of aging properties.
    RESULTS: Increased production by 20% over base levels.
District Engineer / Senior Engineer (1981 - 1993)
Coastal Oil & Gas Corporation (Oklahoma City, Oklahoma)
·         Project Manager for development of a 4,500-acre secondary recovery project in western Oklahoma.  Chairman of joint owners committee that established equity positions shares in the project.  Developed PC based linear program model that optimized Coastal's ownership share and facilitated early unit formation. Supervised consultants in development of reservoir simulation of project performance.  Managed design, construction, installation and start-up of field facilities including budget preparation, materials procurement, preparation of equipment specifications and construction supervision.
RESULTS: Maximized Coastal's ownership position in the project.
·         Directed staff of five coordinating production operations in Oklahoma, Kansas and Texas.  Developed production enhancement program.
RESULTS: Increased production by 15%.
·         Project Manager and Technical Committee Chairman coordinating engineering development, joint ownership determination, regulatory approval, construction and installation of a 2,500-acre secondary recovery project in western Kansas.  Assessed the merits of alternative technologies and evaluated overall economics of the project.
·         Developed PC based program for selection and optimizationof sucker rod designs in pumping oil wells.
RESULTS: Application of the program significantly reduced maintenance and lifting costs.
·         Project Engineer overseeing redevelopment and optimization of a 25-year-old pressure maintenance project in southern Oklahoma.  Implemented use of 3-D seismic technology to identify bypassed oil for further development.  Reviewed well performance and initiated production improvement program. 
RESULTS: Increased field performance by 25% while minimizing operating costs.
·         Managed 7 rig exploration drilling program in western Oklahoma, supervising 12 drilling foremen and engineers.  Initiated use of cutting edge drilling fluids systems to reduce costs and enhance rig performance.  Prepared operating budgets and well recommendations for field implementation.
·         Assessed groundwater contamination problem, applying reservoir engineering techniques as well as new technologies to facilitate remediation.  Taught environmental technology seminar based on this remediation project under the auspices of Oklahoma State University.

Senior Engineer / Senior Project Engineer (1979 - 1981)
Exxon Company, USA (New Orleans, Louisiana)
·         Project Manager of design, construction, installation and facility start-up of a 10,000 BOPD offshore production facility in the Gulf of Mexico.  Coordinated activities of contract design team and developed specifications for equipment procurement.  Developed automated measurement and instrumentation systems. Supervised on-shore fabrication and QA programs and offshore installation. Managed contract administration programs and cost control programs.
RESULTS: Project was completed on time and 10% under budget.
·         Project Engineer coordinating safety and environmental efforts in the Gulf of Mexico.  Developed API standards for subsurface safety equipment.  Conducted risk assessment of Exxon's operations and implemented environmental and safety standards in the Eastern Gulf of Mexico.

Sr. Project Engineer/Project Engineer/Associate Engineer (1979-1975)  Exxon Company, USA (Anchorage, AK/Los Angeles, CA)
·         Project Engineer coordinating joint operations in the Prudhoe Bay field. Conducted joint task force study of drilling operations that applied new technologies. Responsibilities also included budget preparation and project approvals.
RESULTS: Program significantly improved drilling performance.
·         Project Engineer responsible for procedure design and implementation for arctic exploration program.  Managed logistical support for isolated operations base.  Coordinated efforts to comply with SPCC, NPDES and USGS regulations in environmentally sensitive area.
·         Conceived, designed and coordinated installation of waste containment system for offshore barrier islands drilling operation that eliminated discharges into the environment.
RESULTS: The design was key to achieving State of Alaska approval to develop in an environmental sensitive area.
·         Applied state-of-the-art-drilling fluids program to arctic drilling operations that significantly reduced materials usage, waste discharges and overall costs.  Coordinated field application including personnel training and on-site supervision.
·         Conducted design studies of arctic equipment. Developed new technology for overcoming problems in sub-zero temperature environments.

EDUCATION
Master of Business Administration / Finance - Oklahoma City University
Bachelor of Science / Mechanical Engineering -  Oregon State University
Arctic Engineering - University of Alaska

ADDITIONAL TRAINING
PMBOK Short Course - Anchorage AK
Production Engineering, Reservoir Engineering and other schools and seminars
Environmental Law  - Oklahoma State University
Groundwater Monitoring, Protection and Remediation - Oklahoma State University
SARA Title III - EPA

PROFESSIONAL REGISTRATION
State of Texas - Mechanical Engineering

TECHNICAL PAPERS AND PRESENTATIONS
"Dealing with Environmentally Sensitive Properties" - Oklahoma State University




Download Resume Format 

0 comments:

Post a Comment

Resumes By Categories

1-5 Years Experienced CV 10-15 Years Experienced CV 10th Standard 12th Standard CV 15-20 Years Experienced CV 20-25 Years Experienced CV 30+ Years Experienced CV 5-10 Years Experienced CV Accounts CV Aeronautical CV Automobile Engineer B Com CV B Pharma CV B.Tech CV BA CV BA Philosophy CV Banking CV BBA CV BBM CV BCA CV BDS CV Beautiful CV Bio Technology CV BMS CV BPO Call Center CV BSC CV BSC IT CV Business Analyst CV CA CV Cashier CV CEO CV CFA CV Chemical CV Civil Engineering CV CMA CV Commercial CV Cook CV Cover Letter for Resume CS CV D Pharma CV Diploma CV Doctor CV draff Economist CV Electrical CV Electronics CV Engineer CV Fashion Designer CV Films CV Finance CV Foreign Resume Format Fresher CV GM CV Hotel Management Housekeeping CV HR CV ICWAI CV Import Export CV Industrial Engineering CV Instrumentation CV Insurance CV IT CV ITI CV journalist CV LLB CV M Com CV M Pharma CV M Phil CV M Sc Computer Science CV M Tech CV M.Tech MA CV Manager CV Marketing CV Mass Communication CV MBA CV MBA Event Management MBA Finance MBA Hospitality CV MBA HR CV MBA IB cv MBA Marketing MBA Production MBA Quality MBA SCM CV MBA System MCA CV Mechanical CV Medical Representative CV Mining CV MMS CV MS CV MSC CV Over 25 Years Experienced CV Paint Technology CV Pharmacy CV Phd CV Philosophy CV Project Manager CV Psychology CV Purchase CV Quality Engineer Real Estate CV SAP ABAP CV SAP Basis SAP BI CV SAP BO CV SAP CRM CV SAP CV SAP FICO CV SAP HR CV SAP MM CV SAP PP CV SAP SD CV SAP Security Six Sigma CV Special Resume System Administrator CV Teacher CV Textile CV Treasury CV USA Resume Web Designer CV