Systems. Corrective Maintenance and Troubleshooting of the faults happened in cameras and Access control Systems etc.
- Troubleshooting
&Maintenance of CCTV IP Cameras in Ring Topology Network.
- Configuration and
Troubleshooting of Saniyo360 PTZ IP Cameras, Arecont Vision180 IP Cameras,
FLIR D Series Thermal PTZ IP Cameras.
- Troubleshooting &
Maintenance of Milestone corporate management server, 2 Wipro Servers, 8 Pivot3
Servers, 1 Mistral Server.
- Single & Multimode Fiber
Connection, UTP & STP Connection, OFC Connection.
- Configuration of Moxa N port
Media converter, Moxa Power Trans Switch PT-7710, Digital Frontier Timer
Switch, LIU, UPS Connection.
- Installation, Configuration and
Troubleshooting of VMS Software (Video Management Software) Milestone X
protect Enterprise & Milestone X protect Smart Clients.
- GEMYC Emergency Management
System of Mistral, Cameras Configuration on GEMYC DYE-CYP.
- Installation, Configuration and
Troubleshooting of Related Software like, MX View (Industrial Network
Management Software), N port Utility.
- Configuration Troubleshooting
of LAN’s.
- Installation &
configuration of IP cameras (For e.g.
Arecont, Sanyo)
- Configuration of IP &
Network settings in Arecont and Sanyo cameras
- Power connection Of Cameras
with the help Power Supply
- Mounting of Cameras with
Housing and accessories.
- Network Cabling For Cameras
& Crimping of Network RJ 45 connector
- To Check the prerequisites of
Power rating for the operation of camera
- Detection of power cable cut or
any problems related power Cable for normal operation of Cameras
- Moxa media converter power
prerequisites & cable connections for operation
- Moxa media converter
installation & Network Configuration
- Firmware up gradation of
Cameras as well Moxa devices
- Knowledge Of Passive connection
of Cables at camera location
- Physical fittings of different
devices (e.g. Cameras, media convertors, poles etc.)
- Laying down cable and inter connecting camera, LCD monitors, switches, Servers and control unit
- Testing cables, connectors and mechanical joints, measurement of voltages at important test points in the camera pan tilt and Zoom control.
- Commissioning of BTS and
measurement of VSWR
- Coordinate and Review all installation which include Delivery notes, maintenance and operation manual requirements, testing and commissioning procedures and inspections
Programming Languages
|
C
|
Operating Systems
|
Windows
98/ 2000/ XP/ Vista & seven
|
Software Packages
|
MS
Office (MS- Word, Excel, PowerPoint, Outlook).
|
Networking
|
Knowledge
of IP address, Router, Repeater, LAN, WAN.
Troubleshooting
Computer and Network Problems.
Network
Hardware Installation.
Network
Cabling.
Network
Cable Termination.
Hardware
and Software Installation
|
Hardware
|
Assembling,
Installing, Configuring & Troubleshooting of Computers, Operating Systems
& Software.
Installation
&Management of Remote Access, Ghost & Data Recovery.
|
Project
Title
|
VGA
To PAL Converter for TV and PC.
|
Duration
|
15
days
|
Technology
|
C
|
Synopsis
|
The
aim of this project is to convert PC screen display into Television screen
display to view channels on PC
|
Name
of the Organization
|
Modern
Communication Broadcast System, Gandhinagar
|
Duration
|
3
month
|
Training
|
Gained
knowledge about Satellite communication, Channel Broadcasting with installation of C band dishes.
|
Download Resume Format
0 comments:
Post a Comment