Sample Template Example of Professional Curriculum Vitae / Resume / CV Format with Career Objective for BE. in Electronics & Engineering with Fresher Student in Word / Doc / Pdf Free Download
Download Resume Format
MuNNA HUSEN
B.E
(Electronics) r.e
Exit 5 – Al-fia District Riyadh
Contact# 00998765432103
E-mail: munna@hotmail.com
Pakistan Adress 19B1/1
Commercial Avenue phase 17 DHA Karachi
Passport # AD
5226432
Driving
Liencance valid
DOB:2-10-1980
Transferable
Iqama
Professional Experiences -Telecommunication /Project Management&
Implementation, Managed Services /LTE/ WCDMA
Objective:
To seek a
challenging position where my previous experiences coupled with my aspirations
can deliver high value to the team in achieving targets.
MYSON Engineering Systems (Sep-2005 till 20-June2013)
Regional Project Manager /Team Lead for ALCATEL –LUCENT FLM PROJECT for
Mobilink in Pakistan.
Responsibilities & Roles:
Manage
the FLM operation / Managed Services its, implementation, monitoring and
evaluation.
·
Support a highly focused and dynamic enthusiasm with
technical engineering team by providing leadership and mature practice in
requirements engineering and product validation in Telco and Non Telco part.
·
Project implementation in terms of
delivery according to time schedule, customer satisfaction, project profit
margin, project organization and resources
• Making sure PROPS-C Project methodology, processes, tools and measurements in relation to project management are practiced throughout the project life-cycle.
• Preparing required project documentation, related with phases: Pre-Analysis, Proposal/Negotiation Support & Project Planning, Establishment, Realization, Hand-over and Conclusion, consistent with Network Roll-Out (NRO) project categories, including approved and completed project documentation for invoicing purposes.
• Providing effective progress monitoring and control in an integrative method, especially during the establishment, realization and hand-over phases to maintain control of both physical progress .
• Making sure PROPS-C Project methodology, processes, tools and measurements in relation to project management are practiced throughout the project life-cycle.
• Preparing required project documentation, related with phases: Pre-Analysis, Proposal/Negotiation Support & Project Planning, Establishment, Realization, Hand-over and Conclusion, consistent with Network Roll-Out (NRO) project categories, including approved and completed project documentation for invoicing purposes.
• Providing effective progress monitoring and control in an integrative method, especially during the establishment, realization and hand-over phases to maintain control of both physical progress .
·
Strict check on teams directly and
indirectly through Coordinators.
·
Deployment of teams to their daily
activities
·
Participate to resolve issues
personally regarding Telco and Non Telco parts.
·
To achieve targets on their time
schedule as per customers policy
·
Invoicing and operation
·
Making and
monitoring of daily weekly and yearly progress report with proper Audit of
Profit and loss, NAR & NUR.
·
Coordinating with
Client/ contractors for installation and LOS surveys
·
Responsible of all warehouse
related issues and inventory
·
Conduct or participate in
recruitment
·
Participate in regular
meetings with the customer, to report work progress and discuss issues
regarding the services performance and any additional needs to gain
improvements
MES –Field Engineer and worked for
Ericsson Project as a RAN Supervisor for Zong Project in Pakistan (September
2006 till 2007)
RESPONSIBILITIES AS FIELD ENGINEER
·
Performed transmission upgrade Classic to
Traffic Node, Traffic Node to Hi-capacity STM-1 link
·
Supervised both indoor/outdoor installations of
RBS 2000 families.
·
Series included RBS 2106, 2106i, 2107,
2206, 2207 and micro BTS 2308
·
Supervised indoor/outdoor installation of transmission
·
Equipment Minilink family including Minilink
Classic, Minilink Traffic Node i.e. IP based 2p, 6p, 20p and Minilink
Hi-capacity STM 1 link
·
Performed Commissioning and troubleshooting
of Minilink classic node, Traffic
·
Node and Minilink Hi-Capacity link
·
Performed software upgrade activities of
Minilink family
·
Performed NMS visibility activity
·
Performed Mini-Link alignment, E-1 testing
using BERT, RBLT confirmation with the BSC, Trouble shooting for any radio
access problems
·
Conducted feeder testing using Anritsu Site
master
·
Worked as RAN Engineer for
IBS on Ericsson Equipment for CM-PAK & WARID Projects in south.
·
Conducted operation on RBS 2000 family including 2106,
2106i, 2107, 2206, 2207 and micro BTS 2308, 2111 testing
&commissioning, creating/modifying IDB using OMT and Integration of
cell sites, Troubleshooting RBS Faults, Defining External Alarms
Myson Engineering
system Field Engineer for ERICSSON Warid Project in Pakistan (2006-2007)
·
Performed transmission upgrade Classic to Traffic Node, Traffic Node to Hi-capacity STM-1 link
·
Operating software’s OMT for RBS configuration, MSM 6.4 For MW , Path
loss , mapping tool comprehensions of
Transmission etc.
·
Supervised both indoor/outdoor installations of
RBS 2000 families.
·
Series included RBS 2106, 2106i, 2107,
2206, 2207 and micro BTS 2308
·
Supervised indoor/outdoor installation of
transmission
·
Equipment Minilink family including Minilink Classic, Minilink Traffic Node i.e. IP based
2p, 6p, 20p and Minilink Hi-capacity
STM 1 link
·
Performed Commissioning
and troubleshooting of Minilink classic node, Traffic
·
Node and Minilink Hi-Capacity link
·
Performed software
upgrade activities of Minilink family
·
Performed NMS
visibility activity
·
Performed Mini-Link
alignment, E-1 testing using BERT, RBLT confirmation with the BSC,
Trouble shooting for any radio access problems
·
Conducted feeder testing using Anritsu Site master
·
Conducted operation on RBS 2000 family including 2106, 2106i, 2107, 2206, 2207 and
micro BTS 2308, 2111 testing
&commissioning, creating/modifying IDB using OMT and Integration of
cell sites, Troubleshooting RBS Faults, Defining External Alarms
Planam Projects: (OSV of Flextronics for Telenor
Implementation in Pakistan) BSS Engineer to Manager Implementation (2004-2005)
As part of the
core Project Management, team responsibility encompassed entire Deployment of
BSS, Transmission and Support for TELENOR/
FLEXTRONICS Project in South Region
·
Led the project Roll out of BSS and Transmission in
the in Pakistan
·
Acceptance of Phase 1 and Phase 4 as per
internally agreed timescale.
·
On time completion of Amendment Projects / change
orders etc and their acceptance
·
Led the new BSC’s launching/ re homing and other
roll out related activities.
·
BSS Software Upgrade/ maintenance upgrade and
other post project activities
·
Expansions in the regions
·
Part of the core team engaged in launching of Siemens
network and all new features/ enhancements and its acceptance
·
Owner of job change order and other critical
commercial activities in the region
·
Resource handling budget handle of the teams.
·
Close coordination for spare part managements/
critical support and costumer satisfaction.
·
Close coordination with construction manager for
on time completion of rollout.
Professional Trainings & Computer Programs:
·
Training for Ericsson held in
Lahore for QASIS / Quality Auditor
·
Huawei Certified training for
Project Management Program
·
Attended Training for Dragon Wave
P/J for commissioning held in Islamabad
·
Ericsson Training of Installation
,verification, and Maintains of RBS 2116-2216 (Certified)
·
MS –OFFICE
·
MS WORD
·
MS Power point
·
PIVOT
·
TMR/TTM
·
RLBT
Previously Targeted Completed
Projects with Operators
- TELENOR PAKISTAN (NSN
& Huawei)
- FLM PMCL Project with Alcatel Lucent
- HUAWEI U FONE
- ERICSON WARID
- NEC –IP
- NEC WATEEN
- HUAWEI TELENOR
- MOTOROLLA WI TRIBE
- DRAGON WAVE
Education:
M.A
|
2006
|
Shah Abdul Latif University
|
B.E Electronics
|
2004
|
Dawood college of Engg & Tech
|
F.Sc( Pre Engineering)
|
1998
|
Govt High School (Sindh board)
|
SSC(Pre-Medical)
|
1995
|
Habib Public School (Karachi)
|
Download Resume Format
0 comments:
Post a Comment