Objective
|
To take up a
challenging position in a professional organization, where the technical
skills and positive attitude catalyze the growth of the organization and my
growth in the industry
|
||||
Qualification
|
·
Pursued
two years Post Graduate Diploma in Advanced
Construction Management from
NICMAR,
·
Certificate
course from I.C.F.A.I. in INFRASTRUCTURE
FINANCE MANAGEMENT.
·
Bachelor in Civil Engineering from Y.C.C.E. Nagpur (M.S) with 64.01% in the year 2001 – 02.
·
Currently pursuing post graduate diploma in
“TOTAL
QUALITY MANAGEMENT AND ISO9001” from
AIIMS(Chennai)
in distance learning
|
||||
Working status
|
·
Currently working with afcons infrastructure ltd on “Construction of special bridge across
(Chenab
bridge project) in
ENGINEER.
Since twelve months.
|
||||
Project details
|
·
Project cost= 512 cr. INR
·
Project name:- DESIGN AND CONSTRUCTION OF
SPECIAL BRIDGE ACROSS RIVER CHENAB OF USBRL PROJECT
·
Length of Bridge= 1315 mtrs
·
Includes a viaduct of 835 mtrs and Steel arch bridge of
480
mtrs.
of
cable crane.
|
||||
Job Responsibilities
|
·
Complete
job planning in primavera including resource planning, material planning, Equipment
planning, Generation of reports
for MIS.
·
Co-ordination
with other department for progress monitoring
·
Contract
management
·
Preparation
of Claims
·
Client
billing.
|
||||
Experience
|
·
May 2002 – June 2003 M/s S.M.S. Ltd Pune,
·
Project Details:- Construction of 4/6 lane
katraj ghat bypass project
·
Designation:- junior engineer
·
Execution Department
·
Responsible for construction of Viaduct of
length 500 meters.
·
Excavation of tunnel including Rock bolting.
Shotcreting,
·
Erection of PSS sections and concreting
·
Concreting for viaduct and precast girder
casting.
Subcontractor’s bill.
|
||||
Summer Training
|
·
March 2004 to June 2004
·
Completed in S.M. Sancheti Ltd, on “construction of 4/6
lane
katraj ghat bypass project”
·
Job Description:-
·
Study of Contract Agreement preparation of
claims.
·
Study of various planning procedures and
designing procedure.
·
Implementation of various aspects of cost
control in viaduct.
·
Review of complete project planning in
primavera project planner.
|
||||
Graduation Project Training
|
·
Thesis:-
“Experimental studies on rock socketed piles.”
·
Training:-
·
1)
April 2000: Excavation of I.C.P.O. outlet at INDIRA
·
SAGAR PRAKALP, GOSIKHURD
(Approx. Cost 75 Cr.)
·
2)
April 2001: Spillway construction, both NOF & OF
·
sections at INDIRA SAGAR
PRAKALP, GOSIKHURD
·
(Cost 800 Cr.).
|
||||
Thesis
|
·
“Study of subcontracting practices in
infrastructure project.”
|
||||
Computer Proficiency
|
Language
Project Planning software
Design software
Software Packages
Mathematical Software
|
FORTRAN.
MS
Project, PRIMAVERA, Road estimator
AUTOCAD
MS word, MS excel, MS PowerPoint,
MS access,
MS DOS
Matlab, Origin
|
|||
Certificates & Achievements
|
·
Member of institute of engineers association
·
Completed a course in First Aid organized by
·
Certificate in Infrastructure Project Finance
from
·
Registered contractor with PWD &
Irrigation department of
·
Chief organizer of experience 2002(annual
college meet)
·
Attended seminars on prestressed concrete work
arranged by
I.O.E
·
Selected for higher studies in
{
|
||||
Languages Known
|
·
English, Hindi, Sanskrit, Marathi
|
||||
Hobbies & Interests
|
Playing cricket. Volleyball,
Snooker, Swimming Traveling, paragliding
|
||||
Other Details
|
D.O.B.
:
Marital status:
Passport Number:
L.M.V. driving license no:
PAN :
|
27th June 1980
SINGLE
E0079694
ACXPN2147A
|
|||
Salary status
|
Current gross salary. (RS. 21500/-) Expected Salary:- NEGOTIABLE
|
||||
References
|
Prof. Vijay
Patwardhan, Dean – SOCM, NICMAR, Pune.
Mr. M. K.R Rane Former M.D of IRCON.
Mr.Vivek rajulu, General Manager, AFCONS INFRASTRUCTURE LTD.
|
||||
Download Resume Format
0 comments:
Post a Comment